House, design, repair, decor. Yard and garden. Do it yourself

House, design, repair, decor. Yard and garden. Do it yourself

» How to lay a tile on the wooden floor. Put tile on the wooden floor in the bathroom

How to lay a tile on the wooden floor. Put tile on the wooden floor in the bathroom

Wood cladding can cause some doubts, however, there is a certain laying technology in a similar way. Specialists' advice will take into account all the important points in the installation process and perform repairs in the room qualitatively.

1. Is it possible to lay a tile on the wooden floor in the bathroom?

Most often, this question is worried about those who make repairs in private homes and cottages. In such buildings, the base for facing is wood. Facing in this case is permissible, but it is worth estimating the condition of the surface and perform certain works On the eve of the installation.

Further actions depend on the preliminary inspection of the foundation:

  • If the surface is in good condition, in this case a minor processing is performed and the laying can be started;
  • If there are serious flaws, the installation is unacceptable. First, it should be repaired by replacing the necessary parts.

Calculate the required volume of material for flooring room, while you need to consider a specific layout option (a Christmas tree, with a shift, diagonally, rows, etc.).
When repairing with your own hands, it is desirable to choose the easiest way to install, for example, cladding around the rows. With a diagonal direction of layout, the flow rate will increase significantly, since it will be necessary to do trim.

2. Preparation of the foundation for facing

Thinking about how to lay the tile on wood coating, It should be primarily to treat the surface surface. Before facing, carefully check the surface. The coating can be made of board or laminate.
The design of the floor consists of black-level boards that are fixed on wooden lags.


Old paint can be deleted using different methods:
. Mechanical method.
The meaning of this method is to use the grinding machine, or an electric drill with a nozzle in the form of sandpaper. For the primary processing, the graininess No. 40 will be suitable, it is recommended to complete the grinding No. 100 or No. 80. The main advantage of mechanical impact is the possibility of cleaning sufficiently large areas.

. Thermal method.
For processing, you will need a hairdryer of high power, which can warm the air to the value of + 300 .. + 600 degrees. You should keep the device at a distance of 250-500 mm from the floor, after heating, the paint is removed in small parts, using a scraper or metal spatula when working.


Specialists advise you to purchase an industrial hairdryer with a special scraper, so you can combine the process of warming up and clean the wood from paint.


. Method of chemical impact.
For this method, different solvents are suitable. Chemical composition Impregnate paint, applying it with a spatula or brush, depending on the consistency of the substance. The saturation time is 10-30 minutes, after which the paint layer softens and can be easily removed.

By organizing a draft floor, lags are installed over the ceilings. Then the parchment (waterproofing) is paved, the design of the chipboard sheets, HCCB or plywood is completed. Follow the smoke coverage, lagows must be installed in terms of level.


Before laying the material, sheets of chipboard, plywood or G CLEBs need to be treated with a water warm temperature or other composition with protective properties. The device can be started immediately after the impregnation dries.

Preparation of finishing material

Pushes the air from the tile will help the dive into the water, is enough to 10-20 minutes. If spots appear on the outside of the tile, in which case the surface moistening from the inside is sufficiently minor.

3. Do I need a screed?

Before laying, check the coating and evaluate how smooth it, using the level. If there are significant deviations, you need to make a screed before facing.

What ways of alignment exist?

  • Wet screed . Suitable for those cases when it is necessary to increase the strength characteristics of the floor. At the same time, the clearance is organized around the perimeter of the room, given the possible deformation. This condition allows to shift the base without destroying the mounted coating;

  • Dry method of tie . This method is most popular because it allows you to create not only even, but also a reliable floor with a high bearing capacity;
  • Alignment with the help of sheets of GLVB is considered the easiest option . First of all, carefully examine the condition of the floor of the wood. Those bars who rotted should be replaced with new elements. Next occurs the installation of drywall, the sheets are fixed using polyurethane glue, the joints are processed by a sealant. It should also be impregnated with a primer mixture.

4. We put the tile

Basic actions when laying tiles on a wooden coating:

  • On the eve of the floor cladding you need to determine the location of the parts. Meet the center big Wall And on the floor fixed the line, usually it is perpendicular. Such actions are also carried out for a short wall.
  • The resulting lines at the intersection point denote the room center, if the room presents a rectangular shape. Organize the most interesting option Layouts, to the maximum avoiding the trimming of the tile along the walls.

    The floor around the bathroom is advised to facing symmetrically.

  • The composition of glue is treated with 1 sq. M base in one of the corners measured by the center of the room. In order to conveniently distribute glue, it is better to use a spatula or a blade.
  • Given that smooth surface (drops in height not more than 3mm), glue consumption is minimized. In this case, it is enough that the layer is less than 5 mm, because the adhesive composition serves only for the adhesion of the floor and tile. To align the surface, there is a special glue, which is able to eliminate the protrusions (up to 30 mm). Also, the consumption of glue depends on the thickness of the tile.

    No need to knead all the volume of glue immediately, because the laying occurs long enough. It should be gradually breeding the composition, as necessary.

  • You need to create pressure on the tile, then press it to the base. After that, the laying should be continued, heading according to the marked markup. Lump the entire floor surface treated with glue.
  • The layout is sent from the central point to the walls, and certain intervals between the tiles must be observed. After the cafeter is filled with half the floor surface in the bathroom, the remaining part is also lined. Next, it is necessary to wait for the complete drying of the adhesive composition.

    Separate elements must be at the same level. If necessary, you can add a layer of glue.

  • The space between the wall and laid material is complemented by trimming. In order to carefully cut some details finishing material It is better to use a construction cutter.

Sometimes when laying outdoor coatings, it is necessary to hide some object in the bathroom. In this case, use the exact circuit, cutting it with an electron.

  • After the glue becomes solid, the tiles are impregnated with primer.

    There are collections outdoor tilein which the elements are covered with primer. This information is specified on the packaging.

  • A scraper with a tip of rubber is able to fill all the gaps between the elements of the solution. Excess solution can be removed by a moistened with a sponge, on the eve of drying;
  • If the bath is located close to the lined wall, the slot between the wall and the bathroom must be embossed to provide tightness. The clearance of less than 5 mm can be filled with a tile fugue or moisture-resistant grout.

In construction, one of the questions can be the use of jointly different materials on the properties of materials. Many have doubts how to put the tile on their own on the wooden floor and can it be done. When working with your own hands, it is important to carefully examine all the underwater stones of the process so that there are no problems in the construction or operation of the house. If you correctly pick up materials and lay them according to the technology, a multitude of trouble can be avoided.

When there is a need

Many buildings of the old building assume the presence of wooden floors. In addition, during the construction of houses of the following categories, it will be necessary to put ceramics on a wooden basis:

  • framework;
  • frame-panel;
  • bruce;
  • log.
Tile is strong enough, easy to clean and repel water without problems, so it is perfect for laying on a wooden floor

In all these cases, the house design assumes wooden overlapsTherefore, when using ceramic tiles as a finishing material, it is required to put it correctly.

The most important question in this case is whether it is possible to lay a tile on the wooden floor. Laying is possible, you only need to take into account some features of the foundation. The main premises in the house where it is required to put ceramics are:

  • bathrooms;
  • bathroom room;
  • kitchen;
  • halls;
  • corridors;
  • hallway;
  • utility rooms (for example, bearing).

In all these cases, the best option, except to put the tile with your own hands, not to find. Since it is this material that has high strength, wear resistance, moisture resistance and simplicity of cleaning.

Preparatory stage

Before laying the tile laying on the wooden floor, you need to conduct a thorough inspection of the base and make sure of its stability. The need is caused by the following factors:

Wooden floor replacement diagram before laying tiles
  1. Different deformable abilities of ceramics and wood. In the case of a tree, some bends and deflection are possible: wood is easily adjusted for minor deformations due to their own flexibility. Ceramics is a hard material that needs a hard base. If you put it on an unstable base, then large-format products of the floor tiles will give a crack. The output from the position will only replace the floor covering in the house and the strengthening of the base. But it will be right to prevent it and make sure that the stability of the wooden floor or overlap before the start of work.
  2. If a fine-format tile is used, with unsatisfactory quality of the base, the crack does not give it, but cement seams. This problem is also not pleasant, because pollution accumulates accumulate in cracks and cream, they worsen appearance Coatings. In the bathroom to this adds moisture to cracks. With high instability of the base, the floors in the house become uneven, which adds problems during operation.

It is important to remember that the tile has a sufficiently large mass. Laying tiles on the wooden floor creates an additional load on overlap and black construction. When conducting a thorough visual inspection, it is required to identify:

  • schedule the boards of flooring in the bathroom and other rooms in which it is planned to put the tile with their own hands;
  • floor creaking;
  • damage to fungus, mold or other organisms;
  • the instability of all or individual elements of the system;
  • distribution of fasteners.

If at least one of these problems is revealed, the floor requires repair, strengthening or bulkhead. In some cases effective way will be a complete disassembly of wooden floor and fill cement tie.. This is relevant for the houses of the old building with wooden floors. If we are talking about the house with overlapping from wood, a question of gain may arise carrier structures.
Depending on the state of the floor, the method of performing work on laying ceramic tiles is chosen.

Good condition

If we are talking about a new building or when the wooden floors and floors are preserved, you can perform work in the following order:

  1. Preparation of wooden floor under the tile. First, all wooden elements are treated with antiseptics. These formulations will prevent the lesion of wood mold, fungus and harmful microorganisms. Processing is required. As additional protection Antipirens can also be used for wood. These substances increase the stability of material to fire. The event is not obligatory in the construction of the house with their own hands, is carried out at the request of the future owner. The next step before laying the tile in the bathroom, bathroom or in the kitchen (wet rooms) becomes a layer of waterproofing. In the bathroom there may be various leaks that can lead to flooding or damage wooden structures. As protective materials Approach runner, liner, hydroisol, polyvinyl chloride (PVC) film.
  2. After completion of the preparation for the floor, there are gypsum-fiber sheets and fasten them with self-draws. It is important to choose moisture-proof material, especially this is relevant for rooms with wet processes (bathroom, bathrooms, kitchens). The laying makes a rotary, which means the absence of extended junctions in any direction. Before laying a tile in the bathroom or other rooms, the hypovoloconse sheets are fixed to the base by self-draws. The step of fasteners at the same time is 15 cm. In the joints of the joint, the material is fastened with glue. Next, the holes are drilled in arbitrary places to ensure ventilation, after which the joints are ground. When the primer dries on the dry-fiber glue for ceramic tiles. The composition should be approached for working with plasterboard.
  3. Stay tiles. Work should be started from the brightest corner of the bathroom or other room. For the creation of seams use crosses. To align the surface and remove the excess glue from under the tiles you will need a special rubber hammer.

After drying, the mortar takes out crosses and perform the suture of the seams.

Lags in good condition, and the flooring is damaged

If in the room of the bathroom, the bathroom or kitchens rotted the flooring board, they will need to be replaced. Do it in the following order:


  1. Dismantling of the old flooring and flooring boards.
  2. Check the integrity of the lag, the quality of their fixing, the flattering of laying.
  3. If lags are in good condition, proceed to the preparation of wood. To do this, it is treated with protective compositions, such as antiseptics or anti-epires.
  4. Place waterproofing. Materials that can be used are specified in the previous paragraph. The layer is fixed between lags.
  5. If necessary, provide styling between bars heat insulation. Can be used mineral Wat (mats or plates), foam, penplex, polyurethane foam, ceramzite.
  6. Fasten new flooring boards. The mount is performed on the self-tapping screw. At the same time, it is necessary to provide gaps between the boards 5-10 mm. They are needed so that the boards will not be led when wood deformation.
  7. After work, they are performed in the same way as in the previous case, starting from paragraph 2.

Unsatisfactory condition of the floor

If the design is badly damaged, there are two options for developing events:

  • full replacement of wooden floor (flooring and lag);
  • floor removal and fill concrete screed.

The second option is best suited for houses with reinforced concrete floors. The first is considered in the case of wooden buildings. The screed is preferable, because over time, such floors do not bring problems.

As wood agrees, such defects will appear as creak, rotting, saving. But if the tile is laid on the flooring, it is difficult to eliminate them, it will be necessary to seriously repair with time-consuming removal of floor covering.

After replacing the base on the wooden, the work is performed as with good condition of the floor, starting from paragraph 2. If it is decided to fill the screed, the laying is conducted according to the relevant technology.

Conditions guaranteeing a long service life: high-quality materials and proper laying. Solving the problem How to put tiles on the wooden floor and its features are associated with wood properties and room conditions.

A tree is a living material subject to environmental environment, and especially moisture. In conditions high humidity It can form fungus, mold, and numerous wet / drying cycles deform it. For these reasons, it is the opinion that putting the tile on the wood floor in the house is considered undesirable. This is not quite the case, since all listed disadvantages are solved by using high-quality facing materials and a properly prepared basis. If the wooden floor in the house was laid recently, Ideally recommend waiting for its shrinkage about the year, although even after that there is an invisible deformation.

If you put the tile on the poorly prepared surface or directly without preparation on wood, the hiddenness of the facing will violate, the slots are formed between the tiles and it will crack or will come off over time.

The purpose of the work is to create and prepare a rough surface for a screed and future finish. It should be disassembled, processing and gathering again. Wooden floor - complex design, it can consist not only from the floor parquet boardsBut also from the substrate, large beams, lags. Before work, the layers of the floor are checked. If wood boards or parquet are laid directly on the screed, the work is simplified: it is enough to test the reliability, the stability of the coating, and sharpen the gaps.

If there are lags, beams, and, as a rule, in these cases, the flooring consists of tongue boards, you should disassemble it with your own hands and check the condition of all items. The strength of such a floor cannot be determined only by the lack of loosening and embroidation. If dilated elements are detected, they should be replaced.

Check the condition of the wooden base

Is there a script base

Not suitable for laying a tile design with a step of lags less than 0.5 m: The tree will not stand the masses of screed and cladding, the floor will be fed, in such cases they simply add lags.

Alignment and processing of elements

Through the level, the flattering floor is checked. If the design has a break, it is aligned. Lagi raise with wedges of sawn timber. If it is difficult to do, the boards are folded on the lags, and then shy up too much. If the wooden floor without lags has throughout, they must be eliminated. It is removed, make a new screed or put under the flooring thin sheets of plywood and similar materials.

Align lagows

All wooden elements are treated with special antiseptic means, which will prevent rotting, forming fungus. Use impregnation specifically designed for wet rooms. There are special mastic for these purposes on sale, they are non-toxic, without smell and not destroyed moisture.

Antiseptic wooden base protection

Ceramizite and installation of flooring

After drying, the impregnation is embarking the small clay. It fills the space between lags and performs the function of heat and sound insulation. The material does not fall asleep to the edges of the lags themselves, 5 cm is left for an airbag so that the air can circulate, removing condensate.

Ceramzite is used as insulation when furnacely

Then, the flooring is placed, this is the future rough base for tile. In their roles you can use a thick waterproof fan. It makes sense to use old boards. It is necessary to remove the varnish and paint with chemical washes, a construction hairdryer, a polishing machine or a nozzle on a drill with sandpaper.

We process floorboards

Installation of the base under the tile

Flooring and processing of flooring

Some experts recommend to fit the boards without clearance. So do not need: under the action of moisture and temperature in the bathroom, they can expand, despite the waterproofing. As a result, the wooden floor is corded, the tile is sprung. The gaps, just in case, should be 3-5 mm width. Lagged with galvanized self-drawers are attached.

The next action is putting all the holes, including those that remain from the previous fastener. The draft floor is sliced \u200b\u200bor, if it is uneven, lines with a grinding machine. Technological gaps around the perimeter are filled mounting foam.

Grinding a rough floor

The rough wooden basis is ready, it is treated with a specialized latex impregnation that fills all the slots, it is also an additional insulation from moisture. It is enough elastic, she is not afraid of minimal wood expansion. Apply two layers of impregnation, and then an additional layer of special waterproof putty. Working with a floor without lags is easier: it is disassembled, aligned, laid again, processed by impregnation, use a substrate for alignment.

Spacing holes

Sand coat

Processing impregnation

Waterproofing device

It is very important to choose a good waterproofing material. To do this, you can use thick polyethylene, rubberoid, but it is better to purchase a special material that will not pass moisture and at the same time will prevent condensate formation. The whole technology is held, presented here.

Dampfer layer

Avoid deformations, the penetration of moisture into the coating of the bathroom will help a special damper interlayer. Her quality is the main feature of laying tiles on a tree. The role of the layer is performed by a special damper tape, which is sold in construction stores. She acts as a shock absorber and compensator of possible movement of wood.

This amortization insulating layer It is connected to the ceramic tile of solid side, and its elastic bottom is placed on the tree, so the maximum effect of compensation for possible shifts is reached. Wood nevertheless need to breathe to eliminate the formation of mold and fungus. Pores of the interlayer do not pass large drops of moisture, but air passes through them, providing the necessary ventilation and absence of condensate.

Floor screed

It is important to create a solid rigid base for ceramic tiles. For a tile stacked on the wood base in the bathroom, a conventional cement screed is suitable, self-leveling mixtures, construction glue, gypsum mixes in this case are not used. Our specialists tell in detail how to do, so even the newcomer will understand.

It is desirable that the screed is light, but even if it is heavy - the floor with a sufficient amount of lag will endure it.

Cement-based screed

Types of solutions

You can use different materials as a screed:

  • Standard cement screed. Its layer must be a thickness of more than 3 cm. Under it, it is necessary to put on the draft floor and secure a special self-pressing metal grid, on top of which will fill the solution;
  • Polymer screed. Such solutions perfectly align the surface, moisture resistant, are not susceptible to cracking;
  • Universal construction glue. It is preferable to use it for the bathroom, as of its basis it has a liquid glass. The solution, the basis of which protrudes liquid glass, can be made with their own hands, it is enough to mix the following ingredients: water, coarse sand, liquid glass (proportions 1: 2: 2);
  • Polyurethane glue. Such a screed will be plastic and compensate for all the movements of the wooden elements, eliminate the dugout, cracking the tile.

Cement strainer

Universal glue

Moisture-resistant plasterboard and cement-chipboard

Let us dwell on the features of these materials. They can also be used to use for screeds in the bathrooms. Despite the fact that there is a lot of information about using them as a screed or substrate, for bathrooms, specialists do not recommend them. These materials are intended for premises in a house with a low humidity level. It should be noted that in the bathroom, in addition to humidity, there are sharp drops of temperatures, and this destroys such plates.

Method of dry screed of cement-chipboard

If it's still decided to use them in the bathroom, then they fit the "rotary", at an angle of 30 degrees towards the flooring board tab. Between the docking seams should be the gaps, they are screaming special tool For drywall. The edges of the sheets of this material must be processed so as not to pass moisture inside.

Slip seams between tiles

The main nuance in the work on the installation of the tile on the floor of the wood is high-quality isolation and damper layer. If they are properly laid, the tile will serve as long as lining on the usual concrete floor.

Video

Thanks to the range of colors, textures, drawings and other external characteristics, it can compete with practically any coatings, but still the main quality of the tile is its wear resistance, as well as good water repellent and fire-resistant qualities.

Facial facilities

Stereotypically believes that the tile is most often used for a kitchen or bathroom facing. But increasingly the masters are resorted to its use in residential and work premises, not just in the kitchen. One of the most difficult issues for the wizard when working with a tile, which you need to put on the place of the old floor, is this: Is it safe to lay a ceramic tile on the wooden floor and how effective is it?

Most tile manufacturers in one voice declare that their products can not be put on the tree, since the dumping base does not guarantee stiffness and strength for the entire structure of the sexual coating.

If a sufficiently movable wooden floor starts rotting or concrete screed on top of it, it will begin to crack when the boards are started to see, the tile will also collapse and cracks are formed in the floor.

But the joy of masters looking for new ways and not afraid to experiment, today the techniques are known for those in which the laying of tiles on the wooden floor becomes possible. Of course, the most important role in this technique plays the quality of the preparation of the foundation.

Preparation of wooden floor under the tile

At the very beginning of work on laying a new floor over the old an important point It is the correction of those shortcomings and defects with which the previous coating has. If we talk about tile, then the key becomes the key to the key high level Strength and rigidity.

The preparation of wooden floor is divided into steps:

  1. First you fully need to go through the entire wooden floor, remove the boards that have flaws, cracks or rotted. It is important to make sure that the frequency of the lags of lags corresponds to their bearing ability, because together with the tile, the weight of the floor can increase several times.
  2. After the floor is disassembled and passed, it is worth seeing his evenness. To do this, use the level to be measured by the horizontal lag. It is important with this checking to leave the gaps of 10 millimeters between the walls and the draft base. These gaps will need to be isolated by mounting foam. In order to give for a floor of persistence, clamzite is used, which also becomes a good noise insulator and increase the energy efficiency of the floor.
  3. Then the wooden base is stacked. It can be boards if they are in good condition, as well as plywood, the thickness of which is at least 12 millimeters. Such plywood is perfectly suitable as the base for the tile floor and will end it with its weight.
  4. Lags and the rest of the draft overlap need to be treated with chemical impregnations that protect them from fungus and rotting.
  5. Boards, as well as Phaneur, must be consolidated by providing for the presence of ventilation due to gaps between them wide to half centimeter.
  6. Waterproofing from polyethylene film, parchment or bitumen is placed on top of the draft base.

Installation of the base under the tile

The three ways to install the base under the tile are determined, each of which responds its technology:

  • In the first case, use a conventional screed, which is characterized by subtlety and ease. To do this, use a metal grid attached to chernovoy Semi Samores with lighthouses. After that, the cement screed is poured, the thickness of which is about 3 millimeters. It is also permissible to use a self-leveling screed.
  • In the second case, the base of polyurethane glue on a liquid-platform basis is used. It also forms good insulation from moisture. Such connections are adapted for laying tiles on top of the wooden floor, withstand heavy weight.
  • In the third case, the waterproofing is established cement-chip, moisture resistant plasterboard or gypsum fiber. The third of these materials is more recommended, since it has greater durability and plasticity, as well as insulating properties. The bedding is fastened with the help of self-tapping screws, while avoiding the superimposition of the seams of gypsum fiber and floor elements. Suts of the base are sampled by special compositions. In some cases, you can use 2 layers of gypsum fiber. Further, sheets or slabs are covered with a soil base until complete drying. This option is good when the tile is stacked on the wooden floor in wooden house.

Stages of laying

After preparing the base under the tile, you need to make sure of its horizontality that is checked with building level. After that, you can put the tile.

Stages of laying are as follows:

  • preparation;
  • markup;
  • glue;
  • directly laying;

At the preparation stage, you need to correctly calculate the amount of material that will be used. Usually take into account up to 10% of the reserve of the tile area, relatively with the area of \u200b\u200bthe entire room. The main thing is that at this stage it turns out that the purchased ceramic tile wall-mounted, and not outdoor: these two types of tiles are similar to each other, but the wall is fragile and not suitable for sexual coating. It also does not have an anti-slip effect.

After that, the tile is folded over the entire area of \u200b\u200bthe room to externally assess the view of the future floor, as well as reveal places for holes for pipes and other communications.

You need to check whether the height of the new floor allows you to open the door opening. Otherwise you have to change the door height, to outweigh it on higher loops before installing the tile on the wooden floor.

It is important to get rid of the air in the tile, for this it is soaked in water for 15 minutes. If the tile does not withstand such a procedure and stains appear on it, then it is easy to clean the lower surface of the tile with a damp tassel.

Marking and preparation of glue

Marking should be done so that it was necessary to use as few cut tiles as possible by placing them near the walls. When laying diagonally, all the same will have to cut a lot of tiles, and along the wall laying is carried out, starting with the opposite side of the room.

If a designer solution assumes the presence of a special pattern, then you need to act according to this plan, given the need for communications, optimum height Paul and other preparatory nuances.

Next follows the preparation of glue. On the wooden floor, the tile is laid using a special cement glue. For cooking uses acquired dry powder, ordinary water In an amount that depends on the instruction, as well as a number of plasticizers.

Since such mixtures usually have a small drying period (not more than 4 hours), it is necessary to prepare glue with small portions and immediately use. For good laying and high-quality consistency of glue it is best mixed by a construction mixer.

The glue is applied with smooth stripes with a toothed spatula. Start applying in one of the corners, in the center of the room. For each size of the tile it is worth selecting the individual samples of the spatula and its teeth. In this case, the teeth must have a value that is 30-40 times smaller than the tile width.

The glue dries in a short time (up to 15 minutes), so it is necessary to apply it about one square meter of the square, after which the tile immediately impose.

Wooden flooring

Putting the tile on the wooden floor, it needs to be pressed to the glue, using a rubber hammer and light blows to seal the fit. Each section of the treated surface edges must be covered with tiles, after which the next square meter or the area zone is processed.

First put whole pieces tile tile On the wooden floor, and only then embark on the filling of the free cells of the floor near the walls. The necessary pieces of tiles are cut by a special tile car.

After laying, the floor purge with a rag, removing the remnants of the glue. Drying is expected for two days, after which suture compounds are closed. They are lined with fugues that give the floor more aesthetic appearance.

In order to properly apply a fugue, it must be applied by a rubber spatula with diagonal movements. All seams should be filled, after which the remains of the fugues are removed. After that, after half an hour, the fugue dries and the floor should be wiped with a damp cloth, and another hour - flannel. On this tiled floor on top of wood ready.

Thus, it turns out absolutely identical conventional tiled, laid on concrete screedCoating. It has sufficient strength, if errors have not been made when processing lags, plywood and boards. The treated wood will last long as the base under the tiled floor. In addition, it will also provide good thermal insulation.

Through the use of clay and special compositions, the impregnation of the wooden floor, it improves the quality of the tile coating, getting rid of its own flaws. Thus, even the simplest floor becomes a good basis for laying outdoor tiles on a tree.

Half the success of the repair in the bathroom and the long service life of the floor covering, lined with ceramic tiles, depends on the compliance with technology and proper preparing the base under the tile.

Wood - living material and, depending on the environment, can change its qualities, properties and shape. This was the main reason why laying the tile on the wooden floor was considered undesirable.

Today, real professionals tiled with any difficulties, because there are the most modern in their arsenal. construction Materials And advanced technology. In this article we will reveal the secrets and give tips on laying a tile on the wooden floor.


Wooden floor and ceramics - everything will work out!

Wood - material of organic origin, it reacts in different way to a lack or excess of moisture indoors.

Usually, after laying the wooden floor, you need about a year for shrinkage, depending on the floor and constructive features At home, but even after the expiration of this period, there is also an invisible movement. Therefore, if you lay the tile directly onto a wooden surface, the integrity of the facing can break the connection between tiles, which leads to their cracking or dugout.


In order to avoid this the main task It is to create a special damper interlayer between the tree and ceramics, which will act as a shock absorber of possible plaspets of a wooden base. The solid side of the layer must be connected to the ceramic tiles, and the elastic bottom must be put on wood to absorb the movement of lags and boards. Creating a layer will help prevent the appearance of fungus and mold, because wood can breathe.


Preparatory stage - prepare the foundation

Wooden floor is a rather complicated design. It consists not only with the boarding races, which are visible outside, but also characterized by the presence of powerful beams, substrates and lags.

Before the installation of tiles from ceramics on the floor of wood, it is necessary to carefully check all its layers.

For high-quality finishes of the new floor, it is strongly recommended to use tipped boards, before laying which it is necessary to make a revision of all layers of wood floor. The absence of embosques and chance of boards cannot guarantee the reliability of the floor, so it is necessary to make the flooring to prevent possible problems.


Take to the message that lagged lags with a step more than 0.5 meters is not suitable for further installation of ceramic tiles, since the floor simply will not stand the weight of the screed. In this case, you need to add the number of lags.

In order to fully prepare the floor design under the screed and further finishing work, you should adhere to such a sequence of actions:

  • Flooring is removed.
  • Audit and detailed analysis of beams and lags is carried out.
  • If necessary, it is replaced by elements that came with time in disrepair.
  • Using the level, the check is made of how much floor is smooth. If necessary, we produce alignment of the floor covering. To lift the lags, use special wedges from rake trimming. If this method is impossible to implement, then the boards are called lags, and then all excess should be placed in terms of the level.
  • The treatment of wooden boards with special antiseptic impregnations is carried out. Most. the best option It will use mastic that is suitable for rooms with high humidity.
  • When the impregnation is completely dry, fall asleep small clay To fill out all the remaining space between lags. Ceramzit performs the function of insulation and noise insulation. Ceramzit does not fall asleep to the very edge of the lags, and leave about five centimeters to the edge and create an air pad that allows air to circulate freely.
  • Next, put the floorboards who will serve as a draft basis. Many manufacturers recommend using waterproof faeer or green plaster sheets. These materials can withstand greater humidity and constant temperature differences, only need to be borne in mind that the layer of screed and glue in this case should be sufficiently thin.
  • If you decide to take advantage of the creation of draft sex with old docks, you first need to remove paint or varnish from their surface. To do this, you can use special chemical plates or a construction hairdryer. You can also remove the old layer using the emery nozzle.
  • After removing the varnish or paint, the return flooring is made, The gap between which should be about 3 to 5 mm. This clearance is needed for possible expansion of the floor. Fixing of boards is carried out with the help of galvanized screws. For each lag, it is used alone self-tapping screw, and for extremes - two.
  • Next you need to sharpen all the holes, Which remained from the previous fastener.
  • For alignment of rough floors A special grinding machine is used, or simply squeaks the coating if the floor is smooth.
  • Next is the filling of the technological gap throughout the perimeter of the floor. To do this, you can use the mounting foam.
  • Carefully handled the entire draft floor With the help of preheated olifa or special latex impregnation. This action will help create a reliable insulating layer. Then another layer is applied.





Tie options

It is necessary to create a solid and hard base before placing ceramics tiles on the floor of wood. For this, a standard screed is used, but it must be light, because the floor of the wood may not withstand heavy loads. The screed on the wooden floor for further laying of the tile, clinker or porcelain stoneware can be made in several ways:

  • Using a standard cement screed, a layer of which should not be more than 3 cm. First, it is necessary to fix the metal grid on the draft floor with the help of self-tapping screws. Then the fill is made cement mortar or polymer screed.
  • With the help of universal construction glueas a screed, which is made on the basis of liquid glass. And you can also use special polyurethane glue. The above glue options will help create an elastic screed, which will prevent the negative effect of the wooden base movement and the occurrence of cracks on ceramic tiles or its dug. Liquid glass-based solution can be made independently. All that will need is water, clean sand coarse-grained, liquid glass in proportions 1: 2: 2.
  • For premises with a low humidity level, you can use another type of screed - cement-chipboard Or moisture-resistant plasterboard. Their installation must be produced by the "rotary" and under an angle of 30 degrees towards the bookmark of draft boards. Seams on the joints should not coincide. Then the seams need to be covered with a special tool, which is used for a plasterboard sheet.




How to remove varnish or paint from the old base

To remove a varnish or paint from wooden floor, several ways are used:

  • Thermal method lies in the fact that the layer of paint or varnish must be softened using a special construction fabric. When the surface is well warmed, it is followed by a spatula of scraping the entire top layer.
  • Based on chemical method A special bow, which rubs into the floor is used. Thus, it is worth it to wipe wooden boards And the old coating itself speaks.
  • Mechanical method It is that the ordinary skin or metal brush is taken into hand and, thus, the entire top coating is erased.


Description of tile laying technology

When laying a tile on the wooden floor, you must follow some rules and perform sequential steps. But first it is necessary to make sure that the floor surface is smooth and hard. If the floor surface is uneven, you should apply the substrate to align the entire floor.


So to make the tile laying on the wooden floor, you must follow the following instructions:

  • First you need to think about what way you will lay the tile. In order for the location of the tiles to be smooth, the line should be conducted from the center of the wall across the room at an angle of 90 degrees. Then spend another line through the entire room from another wall of the room. Do not forget to remove all door jambs and plinths before installing ceramic tiles.
  • Tile layout must be made taking into account two crossed lines. Sometimes you can shift the lines, because the main thing is to less tiles Dustified circumcision near the walls. Cropped tiles spoil the appearance of the entire room. If there are large items in the room, then near them should be putting a ceramic tile symmetrically. Important elements are bathtub in the bathroom or fireplace in the living room.
  • The glue is applied by small plot Rooms of approximately 1 m² Or you can use an angle that was formed when crossing two lines. So that the glue is applied evenly, it is necessary to use a spatula or a special shovel. Dealers produce fasteners of tiles to outdoor coating. The tile is applied with a rough side to the glue, and then they are strongly pressed to the floor. This action is made with each tile. Line of markings remain the benchmarks. It is necessary to lay the tile on one of the lines until the entire territory that is processed with glue will not be closed with ceramic tiles.
  • Then itching the tile laying, moving from the center of the room to the walls, Focusing on two crossed lines. When half the room is ready, you can go to laying the tiles on the second part of the floor. Send to lay the ceramics on the same level. If some tiles have a smaller thickness, then this defect is eliminated using the adhesive base under the tile.
  • When the entire floor surface is lined with tiles, then you can proceed to filling the gap between the ceramic floor and the wall. The voids are filled with chopped tiles, which is cut using a special cutter. Remember that when cutting ceramics, it is necessary to take into account some distance for the work of further primer. If the tile cuts are used to lad out around a certain item (for example, for the door), then the profile should be activated. With it, you can on the tile are applied the necessary contours, and the cutting is made by a special saw.
  • When the adhesive under the ceramic tiles will completely dry, you can cover the tile of the primer.It should be known that some types of ceramics already have a soil coating. Therefore, you first need to get acquainted with the instructions.
  • Then a special solution fill all the cracks between ceramic tiles, At the same time use a scraper with a rubber lining. Such a scraper allows you to create a solution that will evenly distribute between the tiles. You can also use a sharp angle of a spatula for applying a solution. While the solution is still fresh, it is necessary to remove all excess, using a wet sponge. And then a dry sponge produce polishing ceramic tiles.