150x150 150x200 200x200 145x145 145x195 195x195

BASIC EQUIPMENT OF THE HOUSE FOR SHRINKING FROM NATURAL MOISTURE MATERIAL (INCLUDING ASSEMBLY AND DELIVERY):

  • Log house - timber 150x150 mm (1st and 2nd floor).
  • All partitions - timber 100x150 mm (1st and 2nd floor).
  • Raising the walls of the second floor - 1.2 m.
  • Floor and ceiling beams - timber 100x150 mm. (after 59 cm under the size of the insulation).
  • Roof gables - timber 150x150 mm (height 2.6 m).
  • The rafter system is a board 50x150 mm (after 59 cm under the size of the insulation).
  • Roof outlets at least 50 cm.
  • Roof lathing - board 25x150 mm.
  • Roof covering with roofing felt.
  • Treatment of the lower crown and genital lag with an antiseptic.
  • The height of the cleanliness of the 1st floor is 2.7 m (+/- 5 cm clean from beam to beam).
  • The cleanliness of the 2nd floor is 2.5 m (+/- 5 cm clean from the beam to the ceiling girder).
  • Everything expendable materials(wooden dowels, flax fiber (jute), nails, staples, roofing material).
  • Free delivery in the Moscow region and up to 600 km from our production base.
  • Assembling the walls of the log house on wooden dowels (dowels);
  • Cabin corner joints v " dovetail"(Warm corner)
  • Installation of windows, doors, flooring, stairs and roof insulation are carried out in 6-7 months (after complete shrinkage of the log house) and are not included in the package.
  • Waste collection inside the building and outside in separate heaps.
Service Description Price
Pile foundation strapping bar Serves as a strapping for piles and a support for chafing beams 150x200 18000 rbl
Sub-floor on the 1st floor Edged board 25x100-150mm 17000 rbl
Sub-floor on the 2nd floor Edged board 25x100-150mm 17000 rbl
Additional crown Increasing the height of the log ceilings On request
Replacement internal partitions Increase in thickness from 100 to 150 mm On request
Replacement of floor and ceiling beams from 100x150 mm 100x200 mm 1st floor On request
100x200 mm 2nd floor On request
Generator rental Provided in the absence of electricity on the site, only gasoline is paid is free
Construction change house 2x4 In the absence of housing for builders (after construction, remains with the customer) RUB 18,000
Profiled timber "under the block house" Rounding of the outer side of a profiled bar of any section. Is free
Project Mirroring Is free
changing the project without increasing the material Is free

Select the construction site on the map and the shipping cost will be calculated automatically

View dimensions

View dimensions

STAGES OF COOPERATION

First contact.
We discuss basic issues by phone or e-mail.

We agree on construction details on site. It is important for us to know the location of the house on the site and the way to approach it

Signing a contract.
We draw up a transparent contract. Prepayment 1% - 5%.

Delivery of the house kit to the site, the arrival of the brigade. After unloading, 74% of the cost is paid.

Building a house.
The term of construction of a house "for shrinkage" is 14 - 30 days, depending on the object.

Acceptance and guarantees.
Signing of the acceptance certificate and payment of the remaining 25%. 3 year warranty.

Description of the project:

The project of a 6x8 house with a turnkey boiler room offers to purchase inexpensively construction company"Kostroma Plotnik". Comfortable house with a total area of ​​98.2 sq. m will be for you ideal option both for recreation and for living. A feature of the project is the presence of your own boiler room, thanks to which you will be able to maintain optimal temperature in all rooms.

To enter the house, a terrace was designed from a 6 by 8 bar, after which there is a hall (12.1 m2). To the right of the hall there is a bathroom and a boiler room, and to the left is a living room (17.0 m2), the area of ​​which has been increased due to the attached bay window. A kitchen-dining room (10.4 m2) is planned next to the living room. On the upper level, there are two rooms with an area of ​​21.7 m2 each.

DO YOU HAVE YOUR OWN PRODUCTION?

Yes, we have our own production. We are engaged in the procurement and production of lumber of any section. We are also directly engaged in felling of log cabins different types("Bowl", "in the paw", shaving a log under a plane, as well as under a scraper).

HOW LONG HAS YOU APPEARED TO THE MARKET?

"KostromaPlotnik" has been working in its field for 5 years and already at the moment has a good reputation for the quality of service, work and material supply.

WHY CHOOSE YOUR FIRM?

I want to answer you as the head of the company. We bear a great responsibility for the material supplied by us, its installation. We give a guarantee for houses. We employ only Russians, professionals in their field (which is not at all important). We love to build houses, we love to work and communicate with people. We have the best prices for building houses. Often times, people only look at the cost of the work, not the quality. I can give an example of a similar situation. Some time ago there was a call from the Customer. He was very upset. He started the first construction - a bathhouse. The customer was looking for a cheap option and found it. The bath was delivered incomplete. Even the workers were not provided for the construction. Although everything was spelled out in the contract. The very quality of the felling was disgusting. Calling the company, he was simply answered: "What you ordered, you get it." After that, the Customer contacted us. He was given a brigade. Arriving at the place, the guys were shocked by what they saw. As the saying goes: "I wish these masters to tear off their hands." This is what the undervalued price and attitude to work are all about. Advice for the future, always think over your decision! As for the Customer, my workers put together a good bathhouse. A year later, he also ordered a good solid house from us.

Those who decide to build their own house often do not know where to start. But the layout of the rooms is far from the very first step in the process of building a dwelling. Before developing a project or drawing up a detailed work plan, it is necessary to answer the following questions: what is the total living area of ​​the future home; will it be heated; if so, how? The subsequent stages of construction depend on the answers to them.

Layout one-storey house with stove 6 × 8

Building 6x6 - most likely country house in which it is possible to live not all year round, but only in the warm season. Therefore, its layout is simple due to its small footprint. Its drawing is also simple due to the lack of a heating system. And for year-round operation, buildings are built more spacious, for example, and larger. But then stove heating is simply necessary.

However, the construction company can offer with a heating system. It will include a general and detailed construction plan. The customer, who wishes to have a house with a stove, can make his own amendments, which will be immediately taken into account by the contractor. This option is called construction by individual order.

The client can order from the company not only a ready-made project, but also the construction of a standard house with already resolved planning issues.

Variant of the internal layout and location of the stove in the house

If the customer fully accepts the proposed plan, then the construction will cost him significantly less.

Advantages

When the layout is well thought out, taking into account a specific heating system, then the installation of the stove practically does not depend on the building material from which the dwelling is built. It is suitable for both wood and brick house... Its advantage is that there is always a wide choice of fuel for space heating: coal, peat, firewood, even cardboard and dry tree branches. The user decides for himself what to heat, what is more affordable and cheaper.

Heating with electricity is more expensive, and not all residential areas are equipped with gas.

The next advantage is that the heating of the house does not depend on the heating season of the heating plant, from emergency repairs and long interruptions in the supply of fuel. The furnace is autonomous, the mode of its operation is determined by the user himself, who does not need a plan for seasonal shutdowns of the system.

House layout with a stove 6 × 9 meters

The ability of the stove to create a cozy and comfortable atmosphere is well known. Thanks to this quality, no other heating system can match it. It is pleasant, sitting with a book by the stove, to inhale the smell of tarry wood and listen to their quiet crackling. It is reminiscent of the distant days, steeped in romance. In addition to these advantages, the stove can be equipped in such a way that it will become an original addition to the interior.

Read also

Layout of a spacious 10x10 house for a large family

The Russian stove gives a special charm to the room. In terms of heat capacity, nothing can compare with it. She is able to accumulate heat, and then gradually give it away, maintaining constant coziness and comfort in the hut. In the past, it served as a cooking and heating function. It is rather rare today.

Only those who like the rustic design style of the house will dare to decorate their apartments with it. True, the stove-makers were transferred, who do not need a drawing for its construction. But lately, the project of a house with a fireplace is a common proposal of construction companies. This fashionable heating device heats, but does not accumulate heat at all. Used more as a decorative element.

The century of technological progress has made its own adjustments. Today, a house with a stove that runs not only on solid fuel, but also on electricity, gas, and fuel oil is common. But the most affordable heating material is still wood.

Installation and operation rules

Form, appearance oven fixes its drawing. Many people try to install it somewhere in the corner so that it does not interfere with anyone, does not take up much space. But this is not the main criterion for the installation. Its most rational arrangement reflects, as a rule, each project of a house with heating developed by the company.

In, as well as in or in, it is preferable to put the stove structure in the very center.

Detailed plan of a house with a fireplace stove 8 × 8

Then the effect from it will be the greatest, because it will successfully warm up all the rooms. As practice has shown, there is no way to install it at outer wall so as not to heat the street.

If the plan of a dwelling with a stove system is developed professionally, then after its implementation it will be warm and cozy even all year round. It is recommended to plan the stove in suburban areas or not higher than two-story ones. If it is still cool on the second floor, then some residents close it for the winter, living only on the well-heated first floor.

Read also

Vacation houses or guest places on your site

A very important rule: a house with a stove must have effective thermal protection. Otherwise, all efforts to heat it will be in vain. And money for the purchase of fuel will literally fly into the pipe. You should not save on the insulation of your home. True, not a single company will offer a house project without thermal insulation. But if its layout is with a centralized heating system, then such a construction plan is not suitable for installing a stove.

Layout of a Finnish house with a 6 × 6 stove

It is a mistake to think that if you put a powerful stove in a small building, for example, 6x6, then a small amount of firewood will be sufficient for heating. This is not at all the case. All of them will only go to a weak warm-up. And the rooms will stay cold. Each house with a stove is equipped with a heating system corresponding to the space that it is intended to heat. So, if the home is 6x9, then the heating structure should be more heat-intensive.

Another important rule that should not be neglected is the installation of the stove on a separate foundation. It cannot be the same for her and for the whole house. This should clearly demonstrate how common project dwellings, and a separate drawing of the structure for the firebox.

Detailed drawing of a log house with a stove size 5 × 6

The fact is that the soil sags in different ways under different weights. Why the stove can warp, cracks will appear. As a result, not only heat will flow into the rooms, but also carbon monoxide smoke.

Knowing the installation rules, you should not forget about the rules of use. A house with a stove requires strict adherence to regulations. fire safety... It doesn't matter what area it is, 6x6 or much more. It should be remembered that the chimney damper is closed on time. If the coals are not burned enough, the room will be filled with carbon monoxide. And the consequences of this are very sad. If you close it too late, precious heat will escape into the pipe. The oven is usually repaired by the person who installed it.

    What was done

    Project: the Innsbruck project was adapted to the site and the wishes of the customer's family, a solution was proposed to move the terrace.
    foundation: based on geology and the architect's calculations, the house was erected on a pile-grillage foundation.
    floors: basement - solid concrete; interfloor - reinforced concrete floor slabs.
    box: walls made of aerated concrete blocks, laying on masonry glue. Windows are made to order, with one-sided lamination, on-site installation.
    roof: metal tiles.
    exterior decoration: walls are insulated with basalt facade insulation and plastered, finishing elements are made of wood, made on site, based on TZ-visualization, painted. Plinth lined decorative stone.
    interior finishing: finishing was carried out according to the design project, where the combination was taken as a basis decorative plaster with stone and wood. False beams were installed on the ceilings.
    additionally: a fireplace is installed and finished.

    What was done

    The very case when our Customer and we speak the same language and are inspired by the ECO high-tech style! Designer Ilya came to us with already finished Project your future home! Our team liked the project - after all, such unusual and stylish solutions it is always a professional challenge!
    We prepared estimates for Ilya and developed unique design solutions - all this allowed us to implement this project! Frame house executed in our verified Canadian technology with 200 mm insulation along the entire contour! Outside, the house is sheathed with imitation timber. All windows are custom-made and laminated in the colors of the project. Additional accents are highlighted by the professional timber imitation dyeing and color matching.

    What was done

    What does it cost us to build a house? Indeed, having a team of professionals and knowledge - building a house from scratch is a matter of time! But sometimes the task is more difficult! We have introductory - an already existing foundation, or buildings on the site, extensions to the already standing buildings and much more! For the Matsuev family, it was just such a difficult task. They had a foundation from an old burnt-out house, and a landscaped area around it! The new house had to be built in a short time on the existing foundation. Dmitry and his family had a desire to build new house in high-tech style. After careful measurements, a project was made that took into account the old layout, but had a new modern shape with interesting innovations! The house now has an entrance group where you can sit at a table on cozy evenings and a complex but possible exploited roof in our lane. To implement such a roof, we called on our knowledge and modern Construction Materials LVL beams, bonded roofing and much more. Now in the summer on such a roof you can arrange an unusual dinner or watch the stars at night! In the decoration, our architect also emphasized the minimalist and graphic high-tech style. Smooth plastered walls with painted planken details, wood beams at the entrance added personality. Inside, the house is finished with imitation timber, which is painted in different colors depending on the purpose of the room! Large windows in the living room kitchen overlooking the plot - created desired effect illumination and airiness of space! The house of the Matsuev family - decorated our photo gallery in the section of suburban architecture in the high-tech style, in the style chosen by courageous Customers with excellent taste.

    What was done

    Olga and her family have long dreamed of a country house! A reliable, solid home for life, which will perfectly fit into their difficult narrow area! With the advent of children, it was decided to make the dream come true, children grow up quickly and in own home nature offers plenty of opportunities and fresh air. We, in turn, were happy to work on an individual project for a house in classic style red brick with a bay window! After the first acquaintance with our company in a cozy office, we invited Olga to take a look at our existing construction site: evaluate the order and construction processes, storage of materials on the site, get acquainted with the construction team, and make sure of the quality of the work. After visiting the site, Olga decided to work with us! And we were glad to do our favorite job again to make another country dream come true!

    What was done

    Project: changes were made to the San Rafael project and redevelopment was made according to the wishes of the Customer.
    floors: basement -zhb floor slabs; interfloor - reinforced concrete floor slabs
    box: walls made of expanded clay concrete blocks, laying on mortar ??? Windows inserted.
    roof: metal tiles
    terrace: rough enclosing elements have been made, flooring has been made.

    What was done

    Dmitry contacted our company with an interesting draft design to calculate the cost. Our experience allows us to carry out such calculations for draft designs with minimal errors, no more than 2%. Having visited our construction sites and received the construction cost, Dmitry chose us from many of our colleagues in the workshop to complete the project. Our team has started to perform a difficult and expressive country project with spacious rooms and a garage, large windows and complex architecture. After the delivery of the project, Dmitry chose us as a contractor company, and we, in turn, wanted to do further work on the same high level! Since the object is large, Dmitry proposed a step-by-step cooperation, namely, upon successful completion of the foundation work, we proceeded to the second part of the project - walls + ceilings + roof. Also, for Dmitry, the exact timing of construction was important, in order to speed up the construction processes, the team was reinforced with 2 experienced bricklayers.
    The box on the pile-grillage foundation was delivered on time! The result pleased us and the customer. All stages of the work were coordinated and worked out for Dmitry and his individual project, from which all participants in the process benefited!

    What was done

    Project: The project of our company Inkerman, was changed taking into account the wishes of the Customer's family, the house was planted on the site, taking into account the existing situation on the site and the relief
    foundation: based on geology and the architect's calculations, the house was erected on a reinforced pile-grillage foundation.
    floors: wooden wooden beams, in places of large spans, installation of LVL beams. The basement floor is insulated with 200mm basalt insulation; interfloor overlap with noise insulation 150mm.
    box: box: walls made of expanded clay concrete blocks, laying on mortar. Windows inserted.
    roof: installation of metal tiles.
    exterior finish: the facade is insulated with 100 mm basalt facade slabs, the facades are covered with facing bricks; color solution proposed by the architect and agreed with the customer.

    What was done

    The Krutov family decided to build a spacious house for the whole family!
    Olga and other family members went from idea to implementation in several stages! The choice of technology, long work on the project, construction of the foundation, construction of a house with exterior decoration and then work on interior decoration! The frame technology has been chosen as energy-saving, pre-fabricated and high-tech! Why did the Krutovs choose our company? They liked the quality of work on our construction site and the workers who gave a detailed excursion! We also worked on the estimate for a long time, combining different variants finishes, comparing their cost. This made it possible to choose the best option from a wide variety finishing materials and complete sets.
    The project was created by a friend of the architect, but we had to work out the constructive part of it. After that, the most reliable and effective foundation was erected - the USP. Next, work began on the box. Frame house with 200 mm insulation along the entire contour and unique technology roof insulation of 300 mm. For the exterior, siding was chosen in a spectacular combination of colors - coffee and cream. The accents are highlighted by the powerful overhangs, the interfloor belt and large windows!

    What was done

    When you decide to become the proud owner of your own home and move into a new home for permanent residence, first of all, you think about what the house will be like; what to build it from; how much will it cost and, most importantly, WHO will do all this?
    Alexander, came to our company with the desire to move to his own Vacation home... He liked the Avignon project and was already on the site strip foundation... After the initial visit to the site, measurements and examination of the foundation, we gave our conclusions and recommendations. Strengthen the foundation, change and adapt the project to the dimensions of the existing foundation! After agreeing on the cost, it was decided to build in winter. Alexander received as a gift reinforced concrete floors, one of the leading construction teams and a house according to the project he liked, which stood on a site with an external finish by spring! Alexander watched every stage of construction, regularly visiting the construction site and was pleased with the result, and we were with our work. This is an individually designed Avignon project, realized in stone technology with external insulation and siding!

    What was done

    Each house is a separate story of creation and implementation! Once we built a house for good people and they recommended us to another good person! Andrey Rumyantsev came to our company with a desire to replace the old country house to build a one-story spacious country house with a fireplace for warm family evenings ... It was decided to build the house from aerated concrete blocks so that the future handsome country house would delight the owner for decades! The customer voiced his wishes for finishing - and we, in turn, brought everything to life. Thanks to the detailed visualization of the project, each element of the exterior finish is a member of a friendly ensemble! Bavarian masonry, as the final stage of exterior decoration, looks noble and solid. Without a doubt, such a tandem - aerated concrete and brick can be safely called the best solution in the field of stone housing - warmth, affordable, beautiful, reliable. Modern technologies we have made such a step forward that such unique configurations become available in a short time, because we built this project during the winter months. The main thing is to have the necessary knowledge and constantly replenish their stock!

    What was done

    Project: the project of a European company was taken as a basis and was adapted to the site and the wishes of the Customer's family, a terrace and patio were proposed, taking into account the cardinal points of the Customer's site.
    foundation: on the basis of geology and the architect's calculations, the house was erected on a pile foundation.
    floors: basement - solid concrete; interfloor - wooden on beams with 150 mm soundproofing device.
    box: walls made of aerated concrete blocks, laying on masonry glue. Windows are custom made with one-sided lamination, on-site assembly.
    roof: metal tiles.
    exterior finish: walls are insulated with basalt facade insulation and plastered. Drawing on visualization added facade panels under the stone "Tolento". The enclosing elements of the terrace, balcony are made of wood, made on site, based on the TK-visualization, painted. Roof overhangs are lined with soffits in the color of the roof.

    Vladimir Murashkin,

    The owner of the house "brought to life according to his idea and sketch!"

    House parameters:

    What was done

    When Customers come to us with bright, modern ideas for the future home, we light up twice! After all, to work on a new stylish project is always interesting and a kind of challenge, how to implement all bold ideas from a constructive point of view, what materials to use in this case? Vladimir bought a plot with picturesque views of the Oka River! This view could not be ignored, so a dizzying terrace (51.1 m2) and a large balcony, oriented towards beauty, became an indispensable attribute of the future house! Vladimir wanted to have a rest in nature in wooden house, but it was necessary to build a house in a short time and the ideal solution for such tasks was frame technology construction! If you are to be different, then in everything! The house was made even more spectacular by a vertical finish imitating a timber made of durable larch, painted in natural shades with an emphasized wood texture. Complementing the modern look of the house - laminated windows! It turned out to be a great country house, with a twist and at the same time incredibly functional.

    It all started with individual project found by the Customer's family on the European website. It was with him that she first came to our office. We made preliminary calculations for the project, took a tour of the existing construction site, shook hands and the work began to boil! The architect improved and adapted the project for the site and the customer's family; the foreman "planted" the house on the site. On the fact of geological surveys, it was decided to put the house on bored piles. The frame has grown in a few weeks, then the roof, insulation, exterior decoration! Per winter period a house has grown on the site. The customer invited a third-party technical supervision, who monitored the process independently of our multi-stage control. The color of the color scheme for painting the imitation of a bar was selected by our manager and here we have a bright and cozy country house of the Pushkov family's dreams!

A boiler room is an obligatory component of a country house if you plan to live in it all year round. The small, separate room can be easily adapted to the requirements of building codes. A heating boiler and control automatics are installed here, from here it is easy to control all processes.

Modern building codes provide for two options for organizing a boiler room: the construction of a separate building or a boiler room inside the house.

Why is it worth building a frame house with a boiler room

  • You save building materials as you build one structure, not two. Accordingly, you fill in one foundation, make one roof, and so on. The cost of a house with a boiler room is noticeably lower than that of two separate buildings.
  • Frame house with boiler room helps save space. The place that a separate boiler room could take can be used for a pool, flower bed, gazebo.
  • Constant control. Heating system the house will be supervised. If something breaks, you can respond in a timely manner.

According to the current SNiPs, heating equipment should be located in a separate room or outbuildings with windows and access to the street or in the vestibule of the house. Finishing made of non-combustible materials is required, which increases the level of safety during the operation of the house. We offer projects frame houses from the boiler room in 1, 1.5 and 2 floors.

Projects of houses with a boiler room from "Brusovykh tekhnologii"

We have developed several projects of houses with a boiler room for frame construction... All projects comply building codes and have a different area. In our catalog you can choose both a small country house and a spacious cottage with a large boiler room.

All projects of frame houses can be modified to suit your requirements. If you did not find what you need in the catalog, we are ready to develop an individual solution for you.

We build frame houses with a turnkey boiler room, as well as for shrinkage (log house) and we give a guarantee for the integrity of structures for up to 3 years. Receive Additional information and you can order construction by phone or e-mail.

Houses from a bar with a boiler room are created for winter use. The presence of a special combustion room indicates that it is good project specially prepared for year round living.

The boiler room can be located both in a one-story cottage and on the basement floor. It depends on the wishes of the customer, the chosen project and the preferred heating system.

Where should the boiler room be located?

In most layouts of country cottages, the furnace is located on the ground floor. This is due to the fact that the lion's share of thermal heating schemes involves a reinforced circuit on the ground floor. The second floor is not heated so intensively, and is often completely devoid of heating.

A properly designed boiler room must comply with all technical requirements, and be responsible not only for heating, but also for heating water.

Often, a bathroom and a toilet are located near the combustion room in order to provide a strong water pressure.

What should be placed in the boiler room?

When ordering a turnkey building, you need to understand which units and devices should be in the furnace. The optimal list looks like this:

  • Boilers.

They can work on coal, gas, wood briquettes and biofuels. For heating a cottage from a profiled bar, both mono-boilers (operate on one type of fuel) and combined solutions are suitable. They are capable of processing several different energy sources.

  • Devices for heating running water.

These are usually electric boilers. Less often gas water heaters of various capacities.

  • Capacity for water.

A large tank in which heated water accumulates. Usually its capacity does not exceed 150-200 liters. This is enough for 2-3 people during the day. The water in such a container can remain hot for a long time.

In addition, filters for coarse water purification, hydraulic separators, various elements piping, valves and electrical panel.