» How to make a formwork for the foundation for the fence. We make a formwork for a fence with your own hands

How to make a formwork for the foundation for the fence. We make a formwork for a fence with your own hands

When concreting the base, support pillars, overlaps, as well as decorative elements, it is assumed to formwork for the fence. Without a device of such structures correctly fill concrete mix Will not succeed.

Foundation formwork

And in order to understand the features and types of enclosing devices, it is worth considering all the varieties of formwork, with the help of which the basis of the base for fences from the professional flooring, bricks, concrete slabsas well as stone.

Main types of designs

There are several varieties of enclosing structures that are used in intake construction as a "form" for the fill of the foundation. The main types of formwork can be attributed:

  • Architectural and oblique. Used for the device of non-standard designer structures made of concrete mix;
  • Horizontal. Used to build slabs of overlapping. At the same time, they have a significant thickness and necessarily suggest the reinforcement of the foundation;
  • Vertical. Mounted for laying the base under sufficiently lightweight structures made of professional flooring and metal pillars, as well as fencing from tin and other lightweight materials.

If you wish to install the base with your own hands, you need to decide on the appropriate type of formwork. At the same time, the choice of "team shape" for the pouring of concrete directly depends on the structural features of the barrier installed.

The formwork device may be different. In some situations it is more expedient to install the collapsible or, on the contrary, a non-removable design. Removable devices can be applied repeatedly. At the same time they are collected with their own hands from the girlfriend.

Failure products are long blocks that consist of side-shields limiters. Parts "forms" are connected with each other with special metal screeds, as well as plastic brackets.

What makes formwork from?

You can make a "shape" under the fill of the concrete, with your own pupil materials. At the same time, the boards must be thick enough to withstand the onslaught of the solution.

They are knocked into monolithic shields that prevent the flowing mixture from the form. By and large, it is possible to make a formwork under the foundation from any carrying construction materials, which can be attributed to:

  • flat slate;
  • tin sheets;
  • tolstaya Phaneur;

Foundation device fence

The device "Forms" from a non-aluminated chipboard is undesirable, since this material is capable of sprinkling very quickly, which will lead to the depressurization of the formwork. In addition, to make the enclosing design with their own hands, you need to take into account such nuances:

  • The thickness of the boards and fiberboard should be at least 15-20 cm;
  • On the surface of the materials should not be deep cracks and bruises;
  • When assembling "Forms", nails should be scored with front face constructions and bend outward;
  • Wood-chip should be well dried.

Fitting for a fence made of professional flooring

As a rule, for the installation of fence from the corrugated floor, either a tape, or a belt-pillars foundation is used. In the first case, the design is a concreted tape of a small width, to which the barrier is subsequently mounted. In an embodiment with a tape pillaby, concrete masonry It is performed with a preliminary set of columns in a trench, an imagined formwork block.

Fitting under the fence from corrugated

For stacking the foundation under the fence from the corrugated floor, it is most often used precisely a ribbon and pillaby base. First, the process of fillings the foundation is quite simple, and secondly, when the foundation is planted simultaneously, the reference pillars are installed, which then simply need to hang the sheets from the professional flooring.

To make a "shape" under the fill with your own hands, you should follow these steps of work:

  • Marking of the territory;
  • Digging the trench;
  • Installation of vertical bars;
  • Installing shields.

Device formwork

Pouring foundation

The formwork for a new fence from the professional flooring should be collected by technology, only in this case the fill of the foundation will be high-quality and durable. So, to make the form for a basis, you need to clearly follow these steps:

  • Marking of the territory. To begin with, it is necessary to place the perimeter of the future fence and only then begin to the next stage of the work. In addition, along the laid line, it is necessary to make a mark on the installation of support pillars. They are usually mounted at a distance of 2-2.5 m from each other.
  • Shooting trench. The trench for the fence from the corrugated floor should not be too wide, ranging from 30 to 40 cm, while the depth usually does not exceed 60 cm. However, in places marked to install the columns, it is already necessary to make holes in the finished ditch, their depth should be approximately 15-20 cm.
  • Installation of vertical bars. Now it is necessary to install vertical crossbars with your own hands, which is performed on the inside of the trench. To do this, the holes are broken in the walls of the ditch to the size of the bars. The interval between the established "pile" should be approximately 100-120 cm. The upper parts of the BRUSEV should rise above the ground by about 25-30 cm.
  • Installing shields. Now the formwork itself is going under the fence from wooden shields. For the previously set pile, it is necessary to assemble the monolithic wall on both sides of the trench. It is important that the walls are located strictly vertically. When installing "forms" for filling the foundation, be sure to check the structure for strength. If it seems to you a harp, strengthen it with the help of self-tapping and metal corners from the outside.

As you can see, the design device is quite difficult, so if you need to install formwork with your own hands, you clearly follow the recommendations of specialists. Only then installing and filling the mixture will be made correctly. After performing the last stage of the preparatory work, it remains only to pour the solution into the finished form. In more detail the editing process on video:

Conclusion

Make a solid and high-quality "shape" for the base device with your own hands is quite difficult, especially if a person did not have any business with construction work. It should take into account the depth of the future trench and, as a result, the thickness of the foundation, as well as reliability wall materialsFrom which the formwork will be assembled.


Any vacation home And the cottage is protected by fences, this item performs not only a decorative, but also a protective function, which means it is very important to build a reliable and durable fence. During its construction, a separate attention is paid to formwork, on which the strength of the future design depends. Having understood in some nuances, you can independently build a high-quality formwork for the fence.

Selection of formwork for the foundation under the fence

If the fence is made of stone and reinforced concrete formwork is not installed, but when pouring the monolithic concrete, the formwork structure is a prerequisite. Before installing the future formwork, you need to decide on it.

There are several types of formwork:

  • horizontal;
  • vertical;
  • inclined.

For a massive foundation, a horizontal type of formwork is used, which is removable and non-removable:

  1. Removable formwork is temporarily installed and used more than once. It consists of individual elements that are often homemade and made of existing materials.
  2. The non-removable formwork has the form of blocks and is made of polystyrene foam or fibrolite. They are connected by jumpers and are not removed after the concrete solution is infused. Such a formwork requires a smaller time spent and performs the role of protection of concrete from corrosion.
Regardless of the type, any formwork must be correctly installed, since the strength of the future fence depends on its design.

Materials for assembling formwork

During the installation of formworks use different materials, the main thing is that they sustain the burden, which will create a concrete solution during the fill. Depending on the foundation thickness, the suitable materials are selected.

IN independent work often use:

  1. Plates of chipboard. They are able to make the surface of concrete as smooth as possible. DSP plates are easily installed, but they will not use them during the following work due to their low moisture stability. It will be more expensive than wood boards, but will save time on the installation of formwork and dismantling it.
  2. . In the mounting of the formwork, this material is used more than others. Boards form not only formwork, but also fixing supports, they are economical and easy to use.
  3. Sheets of plywood. Used not as often as boards due to their value. This material is very convenient when installing the foundation. big size. It creates a smooth surface on a concrete solution and can be used several times.
  4. Styrofoam. Frequently used on fixed structures and low foundation. Foams are sold already ready-made blocks, they are connected by special jumpers. Save time on the assembly, light weight and moisture resistant.

Reinforced concrete formworks save the amount of concrete and increase the strength of the foundation design

Installation of formwork for the foundation under the fence with your own hands

The construction of formwork does not require additional equipment. Before installing it, you need to decide with all the moments of work. Make yourself project and sketch of the future fence.

In the project, write:

  • stages of work;
  • select the type of formwork materials;
  • exactly determine the length and height of the fence.

The size will help to set the depth of the foundation, and its length determine the amount of material.

Required materials and tools during formwork:

  • wooden boards;
  • wooden bars 50-70 cm;
  • nails, selflessness;
  • hammer, screwdriver;
  • polyethylene film.

Each of the stages construction work It is thought out to the smallest detail, since the final result and durability of the fence depends on their execution. Installing formwork belt Fundament It is carried out in several stages.

Stage 1. Study of the site of construction and marking of the territory

Many inexperienced builders underestimate the importance of such a preparatory stage.

The study of the site, calculations and marking of the territory will help identify some nuances and think about the solution of the problems that have arisen:

  1. In the process of research, the terrain inspects the enclosed area. On the way there may be various pits, unnecessary bushes, trees and their stumps, laid communications and trash. The study of the place helps to determine what needs to be removed, and what will have to go around the territory markup.
  2. Marking is done around the perimeter of the future fence. It is carried out with the help of pegs and cord. Before marking, a place where the ribbon foundation will be removed and cleaned from unnecessary vegetation.

During the markup, a possible soil height difference is determined, which affects the amount of concrete solution when pouring

Stage 2. Soil Recess

The marking of the territory proceeds to earthworks. The trench rumbles around the perimeter of the future fence.

At this stage, the master should accurately decide on the depth indicators and the width of the trench:

  1. Depth. One of the important indicators, as the distribution of the load on the entire design of the fence will depend on it. If the future fence is light, then the standard trench depth comes to 50-60 cm, but with a massive fence, for example from brick masonry, It is necessary to lay the foundation below the level of the drainage of the Earth.
  2. Width. The width of the trench should not be less than the width of the fence itself, it is also necessary to take into account the thickness of the formwork material, since it is installed on the bottom of the trench on the bulk soil. If there is no possibility to make the walls of the trench vertical, they are digging at an angle.

Before starting the ground, additional pegs are installed and the second cord is stretched on the width of the future trench. After digging the trench, the soil will be highly trambed and falling asleep with a layer of rubble and sand by 15-20 cm and once again tightly tamper. The thickness of the pillow from sand and rubble takes into account during the digging of the trench depth.


The width and depth of the trench is very important indicatorswhich will depend on the load of the fence on the foundation

Stage 3. Installation of bars for mounting shields

Inside the trench, wooden bars have vertically at a distance of 100 cm from each other. Use long bars so that they oppose the foundation for 25 cm. Bruks should be strictly vertically, the work done is checked construction level. Brucks will be attached to the shields of formwork, without them shields will be looped, and the concrete will not make the right fill.

Stage 4. Assembly and installation of shields

The manufacture of formwork shields occurs by knocking down the boards into one canvas, and if the shield is made of chipboard sheets, then they are cut into stripes. Formwork can be raised immediately throughout the perimeter of the trench and pour one stage. Some builders prefer to make the fill in stages, and establish a formwork on a segment of 5-10 meters long.

Shields are a monolithic wall of the boards and are located around the perimeter of the trench on both sides. They are installed on the bars driven earlier. The shield is located strictly vertically, if necessary, straightened the steamed timber. The lower part of the wooden shields must most closely settle on the sand and rubble pillow. Shields are attached to bars with nails and self-tapping screws, preferably from the outer side of the formwork.


After formwork, it is processed to install fittings elements, which increases the strength and durability of the foundation

In addition to attachment to vertical bars, shields additionally secure:

  • struts;
  • sink;
  • various supporting and supporting elements.

If there is a trench outside free placeThe shields are fixed by direct details from the bar. They are placed outside the formwork by 50-60 cm. Bumps are bonded in parallel to each other with horizontal planks, which during the installation process help to adjust and check the same distance between the shields around the perimeter of the formwork.

Dismantling of the formwork system

After the fill of the foundation and its complete drying, they go to the palable. Removing formwork elements need to be made with caution not to deform concrete construction. After proper dismantling discontinued materials Formworks are used on possible subsequent work.

Stages of dismantling formwork is better to calculate from the very beginning of work, before installing the formwork. Demonstrate the most unloaded elements begin and lastly remove the shields. The process starts to carry out on top of the structure, and slowly remove the struts, so-in and possible fastening elements. Removing items are made over several days. It is important to take care of the quality of dismantling, which directly affect the reliability and strength of the concrete base.


Stages of dismantling formwork are performed in the opposite direction to how it was built

Formwork on the slope: features

The fencing on the prone section of the Earth has a decorative and protective function, it ensures the strengthening of the soil from shuffling. There are three types of slopes:

  • low;
  • middle;
  • tall.

With a high slope on the construction site of the Earth, the fill of a stepped foundation is used. This section does not fit the fence by repeating bends of the terrain, which looks aesthetically in the plots of land with low and medium bias. If the Master has a desire to spend a smooth fence, then he should be stopped on the leveling concrete structure.

The manufacture of a ribbon step foundation requires some features of the work:

  1. In the study of the terrain and marking of the territory, it is necessary to determine the height differences between the angles of the fence.
  2. Works on the excavation of the soil begin with the highest point, and the depth of the trench and the base will be different.
  3. Each section of the step foundation is separated separately.
  4. At the bottom section of the construction, the pillow of the cushion and the sand cushion is carried out in the ground, and the foundation will be built on the surface of the Earth.
  5. The formwork of stepped foundation will consist of their sections of the same length in the form of steps.
  6. The fill of the concrete solution starts from the top of the Earth.

The prone area needs reliable drainage and strong foundation

After installing the formwork of inexperienced specialists, it worries the question: "?" The durability and strength of the future design will depend on the quality of the concrete solution. It is necessary to use only high-quality components. Most optimal option Rubble with a fraction of 1-2 cm, the sand is better to use the river, and the cement brand 500. On average, one bucket of the cement will leave 4 sand buckets and 6 buckets of rubble.

The ladder formwork from concrete should be durable, as the monolithic concrete staircase is very heavy. It is installed with wooden boards or metal. The most appropriate is the angle of inclination of the ladder by 30˚. Before installing the board are treated with waterproofing materials.

On the inside of the formwork, it is better to use a smooth fane and polished boards so that in the future I did not have to separate concrete surface. When fastening the formwork elements, use not nails, but screws.

- This is modern comfortable Material Reusable use. A qualitative advantage of such a formwork is its low cost. It is used on removable and non-removable formwork. In the details of such a formwork there are special holes that allow you to quickly and securely assemble a formwork, as well as to simulate it in different ways. The advantage of plastic formwork over wooden is that it does not absorb water and does not take extra moisture from concrete.

Conclusion

The formwork device is a very important stage during the construction of the fence. This auxiliary design helps to form the necessary form to the future base and make a high-quality fill with concrete. Before installing the formwork, it is necessary to correctly calculate the depth and width of the trench and make a high-quality sanding of a sandy-gravel pillow and its rubbing. When installing formwork, use additional supporting elements in the form of spacers, tires and additional horizontal planks. The strength of the installed formwork and the qualitative execution of each stage of the work will allow to establish a reliable and durable fence.

The fence is one of the most important parts of each house. Therefore, it is necessary to approach its manufacture with full responsibility. The first thing to be started is the manufacture of concrete. The process of filling concrete must be started with the organization of formwork. If you want to save money on construction, then formwork for a tape foundation is made independently.

This article will talk about how to make a formwork for a fence with your own hands, without spending a lot of strength and nerves.

There are several types of forms that are used to create a base for concrete structures:

  1. Removable. Used in cases where it is necessary to achieve perfectly smooth faces of the foundation. If in the process of filling the concrete to apply all the rules and technologies of the fill of the solution, then you can avoid additional costs for the surface leveling after the dismantling is made. The main requirement for such a design is simplicity in its installation and dismantling, since with a long length it will be transferred to another place;
  2. Unloading formwork. This design after the fill of the concrete is not deleted, but becomes part of the whole structure, protecting it from moisture. The main advantage of the beaming formwork for the fence is its small cost. If you choose correctly consumables for non-coordinate formwork, the design will gain aesthetic appearance.

Independence on the formwork for the foundation, all designs must comply with the following requirements:

  1. Guarantee the stability and clarity of the form of the foundation;
  2. Withstand the pressure of the foundation;
  3. Hold the specified form;
  4. Installation and disassembly should not take a long time.

Choosing materials

In most cases, to make a formwork for the fence, use boards. It is not recommended to use the chipboard plate, since under the influence of moisture it swells. For one-time use, chipboard can be used. After dismantling the design, such plates should be thrown out. The boards organize shields with dimensions of 100-150 cm long and 50 cm in height. To ensure maximum evenness and quality, metal sheets can be used.

Depending on the selected material to create a formwork for columns, a set of necessary tools may differ.

To fulfill the work, you will definitely need a roulette, a shovel, a screwdriver and a hammer. In some cases, they also need scrap or ax. In order to guarantee accuracy, it is recommended to use the level.

Preparatory work

From the very beginning, it is necessary to decide on next parameters Fence:

  1. Height. It depends on the depth of the foundation. For large fences, the minimum depth is 1 meter;
  2. Long. Knowing this parameter will be much easier to correctly calculate the number of building materials that will be needed for work;
  3. The material from which the fence will be erected. In the event that it is made of stone or brick, high formwork will be required. If the basis of the fence will be metal polesThe formwork for the fence is practically not required.

Base for form

Sleep Class \u003d "Western" Chala must dug a hole. If the trench has a big length, then it is recommended to use special techniques to save time. The depth of the trench, first of all, depends on the height and materials of the future fence. It is also worth paying attention to the fact that in places with minimal load on the fence there is no need to dig a deep foundation. After that, the bottom of the pit needs to be covered with sand, approximately 150 mm. The layer of sand must be tamped, do it until he stops stating and becoming hard. To speed up the process, you can moisten the sand with water.

Form installation process

In order for the design to be high-quality, it must be supported by pillars, which must be buried approximately to the depth of the soil freezing. When installing large fences, such pillars need to be used. After carrying out all land, from the selected materials you need to make shields. All shields need to be combined into single clothwhich will restrain concrete before it is frozen. IMPORTANT: so that concrete does not lose moisture too quickly, it is necessary to carry out waterproofing of the shields. To do this, you can apply runneroid or film.

Pouring concrete

When a formwork for a fence with your own hands will be performed, you can start the fill of the foundation. To do this, in the trench you need to install the lattice from the reinforcement, the rod of which must be fixed with the help of welding.

After that, you need to prepare a solution. You can do this as manually, and with the help of concrete mixer. It is very important to act strictly in the preparation of concrete, which is indicated on the package. It is necessary to knead concrete to obtain a homogeneous mass. After performing all of the above actions, it is possible to pour a concrete mixture, after which it becomes directly erected by the fence.

How to install a formwork on the slope

When erecting a fence, almost in all cases there are small slopes up or down. If the slopes of several degrees do not create any problems, then with a skose, more than 10 degrees need a special approach.

There are two ways to install a fence on the slope:

  1. The fence is placed on one straight line with relief. Is a more easy, but less aesthetic method;
  2. The second options is to organize a falling ladder from support to the support. This method is quite complicated in the implementation, therefore is not always optimal.

How to remove the formwork system?

The analysis of the formwork system must be carried out with caution, since during the removal of the shields you can damage the structure. This can significantly spoil the appearance of the foundation, as well as cause the destruction of the entire foundation. The dismantling process must be carried out in this order:

  1. Remove the items that were used to increase the strength of the structure;
  2. Dismantle all fasteners;
  3. Remove all shields;

After that, all items need to be cleaned and inspect. If damage is not noticed, they can be used in the next site.

  1. It is necessary to ensure that inside the formwork for the foundation there were no sticking nails. Otherwise, problems with dismantling shields may arise;
  2. It is not recommended to carry out work on the fill of the foundation in hot weather, as much moisture will evaporate from concrete;
  3. If there is no possibility to transfer work to another day, then you need to sprinkle with wood chip surface, which will prevent the evaporation of moisture;
  4. All stages of work must be performed sequentially, without a rush.

Performing these recommendations will help with high strength. If before installing the installation, carefully examine the theory and use the recommendations of specialists, as a result, the formwork can be built yourself, and the foundation will be able to simultane more than one year.

It is an important part of each house. Often you can hear: "The fence is the face of the owner!". Given this, it is worth a serious approach to its manufacture. And the first thing to start - the manufacture of the foundation. Although if the fence is performed only with a decorative role, then it is not necessary to equip the capital fence. We will consider the process of filling a solid foundation in detail. And as it is known, its manufacture begins with the organization of formwork. Therefore, if you want to save at work, you will be pleased to know that the formwork for the fence with your own hands is quite forces to everyone.

As a rule, wood is the most common material in the manufacture of formwork. The boards are knocked into strong and monolithic shields. However, this can not be limited. For the construction of this design, any sheet material, plates, etc. can be used.

For example, it can be:

  • Plywood.
  • Slate.
  • Laminated / non-laminated chipboard.

The smooth surface of the chipboard does not allow concrete to clutch with the walls of the formwork, thereby filling all empties well. Although you can use and not laminated chipboard. This material is highly durable, so if necessary, the chipboard may be a good formwork.

Now we offer you a step by step to consider the process of making a formwork for the foundation of the fence.


First of all, it should be solved which dimensions will have your fence.

  1. Height. The depth of the foundation depends on this parameter. For massive fences, the minimum depth is considered to be 1 m.
  2. Length. The length of the fence is also an important criterion. Knowing the length, it will be easier to calculate the desired number of building material.
  3. Material for the construction of the fence. If the fence is a stone or brick, the formwork should be high. If the fence is based on metal poles, the formwork is practically not needed. But this is only in cases where the foundation will not be higher than the level of the soil.


First of all land work is carried out. To do this, you can call a mini-tractor or proceed with a trench manually. Order a mini-tractor is reasonably in the event that the trench has a big length. This technique will cope with work literally in a couple of hours.

Depending on the type of fence design, the pit may be throughout the perimeter, for a ribbon foundation or simply holes for the columnar.

Also note that there is no sense to dig a deep foundation, especially where the load on the fence will be minimal. So, near the columns, the depth can be more, and in the intervals less. The bottom of the trench is covered with sand, layer to 150 mm. This layer must be carefully tumped. The trimmer should take place until he stops stating and not turning into a solid mass. To accelerate this process, moisten the sand layer with water.


For the walls of the formwork, use one-piece shields for backups - wooden bars. Along the edge of the trench, pull the rope / fishing line. Further, back from the edge of the trench 500 mm and drive a bar in the ground throughout the perimeter of the trench, with a 50 cm step. Make sure that the driven bars do not succumb to swinging. Otherwise, hammer the bar elsewhere where the soil is more stable.

At the next stage, lower the shield in the trench on both sides of the walls. At the bottom it should touch the pillow tightly. Also prepare small bars that will perform the role of a horizontal screed. They are installed above the soil level and are nailed to the papers with nails.


If you want to build a stronger formwork, you can use metal connections for the screed.

Next, it is necessary to install struts to the shield from the driven bars to the Earth. It also uses wooden bars. To the shield, bars are fixed with nails. Now is the time to check the strength of the formwork. An important point In the manufacture of formwork is the horizontal level. If, due to the drop in the soil level, in some places of the shield for a level, then you can add several bars, having navigate them to the shield.


After performing everything preparatory work And the structure of the formwork, you can start the last step - the fill of the foundation. But before this it is necessary to place the reinforcement inside the formwork. It will provide the best bundle and fortress of the foundation. Also additionally through each meter will score fittings to the ground. If you plan to build a massive fence, then you will need to make a dressing of reinforcement with a wire of a kind of making Armopoyas. After that, you can produce concrete work.


Not all areas are perfectly smooth. If the level of land for several degrees has a bias from one of the parties, then no special action should be taken. A completely different situation when the soil level has a drop of 10 ° and more. In this case, the nature of the formwork installation changes slightly.

Immediately it is worth noting that there is nothing complicated in it. There are two solutions to this situation:

  1. Install the foundation and fence into one line with the terrain of the landscape. From aesthetic side, this is the right approach, plus it is easier to implement everything.
  2. Build a falling ladder to the support. This option can be called more correct, that it will look more effectively. At the same time, the foundation after each column will have a kind of step. There is more aesthetics here, but the practicality is very low.


For the foundation described in the second embodiment, the production of formwork has its own characteristics. Therefore, consider the construction of such a design more.

  • Pouring such a foundation should be up to the relief.
  • Each shield for formwork should have a SCOS corresponding to the slope.
  • Each protruding end needs to close the board.
  • It is important to properly remove the soil when arranging a step foundation. The bottom of the trench should also be in terms of the level and go steps, parallel to the line of the base of the future fence. This will increase the stability and strength of the foundation. It also prevents the location of the foundation and its destruction.

As can be seen, this process will be sufficiently protracted and at the same time time-consuming.


When building a formwork, there are several important recommendations that general technologies Do not mention:

  1. Make sure that the ends of nails and self-tapping came into inside the formwork. Otherwise, you will have problems with the removal of formwork with the frozen foundation. If you are using fiberboard, then nails can be scored from the inside.
  2. Fill the foundation for priority in cloudy weather. This is important, because after the first phase of the hole, the existing moisture in the concrete will not evaporate and acquire greater strength, and it is about 30%.
  3. If the fill occurs in dry and hot weather, then sprinkle the surface with wood chips. It will promote moisture preservation.

So, following these unaccomposed advice, you will get the construction of formwork and fill the foundation for the fence strong enough. But remember, the hurry in this work is not welcome. This applies to both the installation of formwork and its dismantling. Each stage of work spend consistently and slowly. If you have mastered another formwork manufacturing technology for a dacha fence, then write to us in the comments, to this article.

Video

in this video material, you can learn more about the principle of making formwork:

Schemes

In schemes can be seen constructive features Formwork manufacturing:








Construction of fence on cottage plot Starts with formwork. The quality and strength of the structure depends on the design. The answer to the question like a formwork for the fence, lies in its strengthening connections. What they are more, the better.

Requirements for formwork and preparation of the foundation

The formwork structure is a prerequisite for building a fence regardless of its type. The design forms a fixed frame. Formwork, made with your own hands, must meet the conditions:

  • prevent possible bends;
  • withstand the mass of the foundation;
  • maintain and provide direct lines of future base.

Make a formwork from plywood, metal or simple boards. The design should be easily installed and dismantled. The material is selected taking into account the height of the foundation above the ground level.

The process of building a formwork, built under the foundation with his own hands, begins with the mystery of the pit. For the brick fence, the dripping is broken throughout the perimeter, for other structures it is enough to form ditches where the poles will be installed.

The depth of the ditch of meter, in places where there are no pillars, is allowed to 50 cm. The width depends on the fence.

The prepared pits are covered with a sand pillow from 10 to 15 cm and trambed until the pillow becomes solid solid base.

Construction of opull

For the design, materials are harvested in advance. Fale shields or chipboard are used more often (wood chip stove), backups - brus from a tree.

In order for the formwork to be built with his own hands, it was flat, a twine from one corner to another (markup) is stretched along the edges of the ditches. Every 50 cm in the soil, the bars are driven, retreating from the edge of the ditches about half a meter. Boards are installed carefully so that they do not give in to the roll.

Plywood or chipboard is lowered on one side of the pit and pressed against the sand pillow close. The same work is done from the other end of the trench. Nails to plywood are nailed clock bars - horizontal ties. They are mounted slightly above the soil level.

The backups are installed at an angle of 45 °. The backups are driven into the ground and to the upper edge of plywood. Supports mounted at an angle will not allow concrete to break a smooth line of formwork.

Pouring design

Observing the sequence of work, a durable formwork is built under the fence. Make it with your own hands is easy. Before filling the cement, reinforcement under the foundation.

  1. Armature bar harvested. Thickness 10 mm. Mounted from the bottom of the pit by 5 cm. Under the pins install support.
  2. From the walls of the ditches, 10 cm retreats, and the first two rows of fittings are installed. Horizontal pins are mounted with a vertical at a distance of 40 cm.
  3. Welding vertical lines are connected to horizontal bars for the adoption of a single durable structure.

After installing the valves, cement mortar is prepared.

  1. In large capacity, cement and water drill with a special nozzle are mixed. Relation: 0.7 cement is added to part of the water.
  2. The resulting mixture is mixed with sand, a little more than 3: 1. Crushed stone added, the proportions are the same.
  3. Lastly there is a plasticizer not more than 1% of the total mass of the solution. The composition is mixed to a homogeneous state.
  4. The cement is poured into the formwork with layers to prevent the formation of air bags and punctured iron rod.
  5. After completion of the work, the channels are covered with film, sprayed with water twice a week.

The frosting of cement is completely occurring within 28 days. The formwork is removed on day 15 in reverse order:

  • planks are removed between the bars;
  • piles and design shields disassembled to the edge of the pit;
  • plywood is dismantled.

Fill a non-removable formwork

When erecting the fence may arise how to make failure formwork Under the fence with your own hands. For this, all components are fasten as in the designer.

Facial formwork under the foundation is collected from various materials:

  • polystyrene foam;
  • cement and pinch solution;
  • fibrololite is small wood sawdust with magnesite.

Selected blocks are connected to each other with jumpers. This prevents concrete. Ship-groove fastens the top row with the first line. When using the supports, the backups are not installed. Only reinforcement with rods, a circle is 8 mm.

Fill cement mortar It passes with layers of 20 cm, with piercing. In order not to damage the formwork, the solution is poured from a height of no more than meter.


The non-removable system provides:

  • less work;
  • durability and resistance of corrosion of the foundation;
  • proper geometry lines.

Formwork on the slope

Building formwork under requires some other actions. In various areas of the dummy pit there are horizontal level drops. Therefore, at the lowest point of channels, the formwork is constructed higher than in the high location of the trench.

Reinforcement occurs from the rods of a large diameter or the number of iron pins doubled. After reinforcement, concrete is continuously poured. Filling formwork on the slope in several stages, it will lead to the cement rupture along the boundary of the layers.

The foundation is carefully tumped to prevent the formation of air bubbles. A flooded solution freezes about a month.

Nuances with formwork

During the construction of the formwork, the screws and nails should not be stitching inside the construction. This leads to problems when removing plywood shields.

Plywood and chipboard sheets are nailed from the external and inner side: the strength of the structure is ensured.

When filling the formwork on hot dry weather, concrete sprinkled with small wood sawdust - preservation of moisture and coolness for cement.

High-quality formwork, built with your own hands - the guarantee of the strength of the future buildings. The non-removable system serves as an additional layer of waterproofing under the foundation. Removable design allows you to use it repeatedly and move the parts along the fence line.

How to make a formwork under the fence Updated: February 26, 2018 by the author: zoomfund