Construction of a roof frame with four slots - a difficult process with characteristic technological features. When erected, their own structural components are used, a sequence of work production is distinguished. But the result will affect the spectacular form and resistance when refilling atmospheric attacks. AND house master Can be proud of personal achievements on the field of the roofer.

However, before deciding to the device of such a design, it is necessary to familiarize yourself with the algorithm, according to which the rafter system of the four-tie roof and the specifics of its device is constructed.

The class of four-tight roofs combines two types of structures resembling a square and rectangular envelope. The first variety is called the tent, the second - Walmova. Against the background of scanty analogues, they highlight them the absence of frontones, referred to in the roofing case with forceps. In the construction of both options four-page structures Used ulissions I. hanging rafalThe installation of which is made in accordance with the standard technologies of the facilities of the pitched rafting systems.

Characteristic differences within the four-page class:

  • At the tent roof, all four slides have the shape of an equally chained triangles whose vertices converge in one highest point. There is no skate as such in the tent construction, its function performs a central support in the sleeve systems or the peak of the hanging farm.
  • The holm roof a pair of basic rods has a trapezoid configuration, and the second pair is triangular. From the tent assemblement, the hip design is characterized by a mandatory presence of a skate, to which trapezoids with upper bases. Triangular rocks, they are hips, adjacent to the skate of the vertex, and their parties are docked with the inclined sides of the trapezium.

Based on the configuration of the roofs in the plan, it is clear that the tent structures are taken to hoister over square buildings, and the holm over rectangular houses. The coating is suitable as soft and. A characteristic square or rectangular form repeat the drawings of the rafter system of the four-tie roof with a clearly designated arrangement of elements in terms and vertical projections of the skates.

Often, the hip and tent systems are associated with the construction of a single object or effectively complement the duplex, single, broken and other roofs.

Repeat designs with four slots can directly on the upper crown wooden house Or to Maurylalat, serving the upper strapping of brick or concrete walls. If you can find the upper and lower supports under each ralfiline, the roofing frame is constructed on the sleeve technology.

Installation of removal rafting legs is easier and more affordable for inexperienced home roofer, which needs to be taken into account.

  • With a hard fastening of the upper and lower heel of Stropilin with metal corners or with a support wooden lining, a reinforced mount of Mauerlat will be required, because it will be passed on to it.
  • With the tight fixation of the upper heel and the hinge attachment of the line of the rafter, the Mauerlat is not needed, because If the load is exceeded on the roof, the hinge mount, for example, in the slider, will allow the rafter to shift slightly, without creating pressure on Maurylalat.
  • With a hinge fastening of the top of the stringlin and hard fixation of the Niza, the retriverest and pressure on Maurylalat is also excluded.

Mounting Muerolat and closely related method of installing rafting legs according to the rules are solved at the design stage of the house. If the structure does not have internal carrier wall Or not the ability to build reliable supports under the central part of the roof, in addition to the hanging scheme of the assembly of the rafter system, nothing will suit anything. True, in most cases, the utilization method of the structure is applied, to implement which it is necessary to provide a carrying support in advance.

Specific structural elements are used in the device of rafter systems for tent and holmic four-tight roofs, this is:

  • Diagonal rafting legs forming ridge connections of skates. In the hip structures, diagonally, they are the same rafters, connect the skate run consoles with roof corners. In tent systems, the savory legs connect the vertex with corners.
  • Nonocents, or rafting midnights installed perpendicular to the eaves. They are based on diagonal rafylics, are located parallel to each other, therefore they differ in a multiple length. Nonocents form planes of tents and holmic rods.

Diagonal rafylics and narigines are also used to build funds, then the concave roof corners are suitable, and not convex as holm.

The whole complexity of the structure of frames for the roofs with four slopes is to install diagonal rafalines, which determine the result of the formation of the structure. In addition, the shorts are required to keep the load in one and a half times greater than ordinary rafting legs of the pitched roofs. Because they are part-time working as a skate, i.e. Support for the top heel of nurses.

If you briefly describe the procedure for the construction of a changeable frame for a four-page roof, then you can put in several stages:

  • Device Mauerlat on brick or concrete walls. The process of the device of Mauerlat on the walls of a log or timber can be abolished, because It can successfully replace the upper crown.
  • Installing the central support for tent construction or support frame of the main part of the holm roof.
  • Installation of conventional sling lines: pairs for a tent roof and a certain design solution of a row for a hip structure.
  • Installing diagonal rafting legs connecting the angles of systems with a top of the support or extreme dots of the skate.
  • Production in size and fastening of narigines.

In the case of a hanging scheme of the frame of the construction start tent carcass There will be an installation of a triangular rafting farm in the center. The beginning of the installation of a four-tie hipper system will be the setting of a number of rafting farms.

Construction of a hipper system

We will analyze one of the common examples of the device of a holmic roof with urban rapid legs. It will be relying on the beams of overlaps, laid on top of Mauerlat. The rigid fastening of the word will be used only for fixing the top of the rafter legs at the skate run, so that there is no need for Mauerlas in strengthening. Dimensions of the box provided in an example of a house of 8.4 × 10.8m. The real sizes of the roof in the plan will increase with each of the sides by the magnitude of the cornese swell, by 40-50cm.


Mauerlat base device

Maurylalat is an element is purely individual, the method of its installation depends on the material of the walls and architectural features of the construction. The method of laying Mauerlat is planned according to the rules during the design period, because for reliable fixation, Mauerlat is recommended:

  • Light foam concrete, gas silicate and similar walls to equip the reinforced railway belt, filled around the perimeter, with anchors installed during the filling period.
  • Brick walls finish with a side of one or two bricks along the outer edge so that a process of laying is formed along the inside edge wooden Rama. During masonry between bricks, wooden tubes are laid for mounting Maurolalat brackets to the wall.

Mauelalat from a bar of 150 × 150 or 100 × 150mm is made. If the operation is assumed to operate the piercing space, it is desirable to take the bars. In a single frame, the timber is connected by oblique wrist. Then, the compound areas are enhanced by self-draws, ordinary nails or chophary, and the corners are strengthened with brackets.

On top of the Mauerlat, built optimal in the horizon for a particular building, laying overlapping beams. Used timing segment 100 × 200mm. The first thing is stacked by the beam, passing precisely along the central axis of the construction. In the example of the length of the bar for the construction of solid beams, there is not enough, so they are going out of two bars. The plot of dusts should be located above a reliable support. In the example, the inner bearing wall is used.

Step between the beams of overlapping 60cm. If the core box does not differ in perfect parameters, as it happens in most situations, the distance between the beams can be changed a bit. Such an adjustment allows you to slightly "to rod" construction of construction. Between the extreme beams on both sides and the walls of the house, the lumen of the 90cm wide, which is necessary to set the removal.


Because Overlapping beams will be able to form only two farmery Swim, their ends join short semi-bits of overlapping - take-off. They establish them first only in the area of \u200b\u200bthe main part of the holm roof, exactly where the rafter legs will have to be mounted. To Mauerlata, the removal is nailed with nails, they are attached to the beam with screws, large-caliber nails, copulings, enhance fasteners.

Construction of the skate part

The central part of the holm roof is an ordinary batch design. The rafter system for it is arranged according to the rules that dictate. In the example, there are some deviations from the classic interpretation of the scoop principle: the pregnant is not used, which is installed by the traditions for the skate run. Lenzny work will have to perform a central overlap beam.

In order to build the skate part of the rafter system of the hip roof:

  • Build a support frame for rafting legs, the top of which will rely on the ski run. Run to rely on three supports, the central of which is installed directly on the central beam of overlapping. To install the two extreme supports, two transverse bars are first stacked, overlapping at least five beams of overlapping. Stability is increased by two subposses. For the manufacture of horizontal and vertical parts of the support frame, a bar bit of 100 × 150mm was used, the saws are made from a 50 × 150mm board.
  • Make the rafter legs for which you first need to make a template. Board suitable sizes It is applied to the place of installation, the lines of future marks are stuck on it. It will be a template for streaming production of rafaline.
  • Set the rafting legs, the tops of them on the ski run, and the lower heel on the removal located opposite.

If the beams of the overlap were stacked across the box, the rafters of the main part of the roof would relieve the overlap beams, which is much reliable. However, in the example, they rely on the removal, because they need additional mini-supports to be arranged. These supports should be positioned so that the load from them and the stringly located above is transmitted to the walls.

Then mounted three rows of deposits from each of the four sides. For the convenience of the implementation of further actions, the roof circuit is drawn up by a cornice board. To nourish overlapping and ending it, it needs to be strictly horizontally.

Installing angular deposits

In a limited cornice board, the space remained corner areas, unfilled by the details of the rafter system. Here will require angular deposits, for mounting which is carried out as follows:

  • In order to designate the installation direction, we pull the lace. We stretch from the point of conditional intersection of the extreme support of the frame with the beam of overlapping to the corner.
  • Top on the lace we apply a bar on the place put it. Holding a bar, out from the bottom out of the lines of sleep at the place of intersection of the Bloom of the overlapping beams and angular connection Curisa boards.
  • A finished removal with scaled surplus is attached to Mauerlat and to the beam overlap.

The remaining three angular deposits are similar and mounted.

Installation of diagonal rafaline

The diagonal, they are the same, the rafter legs are made of two cross-shrinkable boards with a cross section of equal size of ordinary rafaline. In the example, one of the boards will be held by the stop above the second due to the difference in the corners of the valves and trapezoid rods.

Sequence of work on the manufacture and installation of nosov:

  • From the highest point of the skate, we stretch the shoelace to the corners and to the central point of the skate. These are auxiliary lines for which we will celebrate the upcoming drums.
  • A carpentry tilter - a small measurement the angle between the cord and the upper side of the corner takeaway. So the angle of the bottom washed. Suppose it is equal to α. The angle of the top was calculated by calculating the formula β \u003d 90º - α.
  • At the angle β spire one edge of an arbitrary cutting board. We apply it to the site of the upper attachment, together with the edge of this billet with a lace. Delaying the surplus that interfere with a dense installation. On the outlined lines you need to cut again.
  • At the angle α, we cut down the bottom heel on another trimming of the board.
  • We make the first half of the diagonal rafylic, using the upper and lower support patterns. If the whole board is not enough in length, you can smack two segments. It is possible to combine them planted on a self-tapping screw to a metering piece of inch, it should be arranged from the outside of the constructed covered leg. Install the finished first part.
  • We make the second part of the emergency rafter, but we take into account that it should be slightly lower than its first half. The area of \u200b\u200bconnecting boards to one element should not coincide with the splicing site of the first half of the wind.
  • We sew two boards with nails in the dispersion with a step of 40-50 cm.
  • On a lace, stretched to the center of the skate, blacksuate the line, which will need to be adjusted to be removed to dock it with an adjacent hostess rafylic.

Following the described algorithm, you need to install three more diagonal legs. Under each of them should be installed in the place of attachment of angular deposits to beams. If the span is more than 7.5 m, another support is installed closer to the skate in diagonal.

Production and installation of hip rafters

Lace between the top of the skate and the center of the skate is already stretched. She served asses to outlining the marbles, and now it needs to measure the angle γ and calculate the angle Δ \u003d 90º - γ. Not retreating from the proven path, we harm the templates for the upper and lower support. The upper trim apply to the place intended for him and mark the lines of the marbles for the dense entry between the diagonal rafylic. According to the billets, we make a central foot of the Walm and fix it, where it is relying.

In the space between the angular deposits and the cornice board, we establish short removal to impart the stiffness of the design and to ensure strong fixation of the extreme, shortest nurses. Next, it should be done by the manufacture of templates for the nashelnikov:

  • The cutting of the board was stored at an angle δ and put it on the place of attachment to the diagonal rafylic.
  • Delayed by the fact that the surplus you need to cut again. The resulting pattern is used in the manufacture of all nigsions, such as the right side of the hip. For the left side, the upper pattern will be squeezed from the opposite side.
  • As a template for the bottom heel of narigines, we use the cutting of the board, sipped at an angle γ. If all previous steps were performed correctly, then this template is used to manufacture the lower nodes of fastening all other nurses.

In accordance with the actual length and "testimony" of templates, these are manufactured by narcents necessary to form the planes with hollow and unfilled by ordinary rapid feet parts of the main rods. They establish them so that the upper nodes of fastening of narins to the diagonal rafalines were located in the dispersion, i.e. The upper connecting nodes of adjacent skates should not be converged in one place. Noncentas are attached to the covered rafter legs with corners, to the beams of overlapping and removal, as reasonable and more convenient: corners or metal gear plates.


Based on the technology of the tent roof device, already familiar hip principles are laid. True, the skunk part of the rafter system in their design is not. A construction starts with the installation of a central support, to which the covered rafylics are joined, and narrows are already narrowed. If the envelope is used in the roof of the roof, then the finished rafter farm is installed.

We invite you to use our free online calculator For the calculations of the building materials when device of a hip roof - and follow the instructions.

Useful video instructions

Briefly with the sequence and rules for mounting the rapid system of the four-tie roof of the tent and holm categories will introduce the video:

After reviewing the specifics of the device and having learned the details of the installation of the roofs with four slots, we can safely begin to implement plans for its construction.

A four-tight rafting roof is considered a rather complicated structure. The construction of such a design is recommended to entrust experienced professionals that will help correctly calculate the angle of inclination of beams and choose the optimal weight of roofing materials.

This design has both advantages and disadvantages. Before choosing such a roof for your home, it is recommended to thoroughly think about the positive and negative sides of the four-grade roof.

The main advantage of such a structure is aesthetic form of residential building. Due to this, the house acquires smooth and streamlined forms.

Varieties of a four-tight roof

Several types of similar designs are distinguished. Standard construction is an equifiable triangles that are connected in the center point.

Beginner builders are often confused by a four-sheet roof with ordinary tent roof. It consists of triangles, which are in the background from above the correct square.

If the plan shows a rectangle, then we are dealing with a hip structure. It received this name as a result of using special skates, which have an appearance of a forcepets - Valm.


The four-sheet roof is divided into the following types:

  • dutch;
  • half-haired dutch;
  • danish half-haul;
  • tent.

The Dutch roof is distinguished by its resistance to climatic cataclysms. Here are two trapezoidal skate. The upper parts have long correct triangles, and the side are presented in the form of shortened corners.

In this case, a rafter system is used in which four inclined beams are used with the required angle of the skate. The calculation of the four-page roof occurs on the basis of the area of \u200b\u200bconstruction.

Due to this, it is possible to correctly arrange inclined beams and the distance between them.

The half-haul Dutch roof can be made both double and four-tie rafting roofing. For the construction of such a design, it is recommended to carefully select building materials.

Bearing supports must be made of wood of dense tree species. This variety is distinguished by its durability and endurance towards natural cataclysms.


Advantages and disadvantages

What advantages and disadvantages have a four-tie roof? Experienced specialists allocate the following positive qualities of such a structure. These include:

  • lack of frontones. Due to this, it is possible to improve the roof aerodynamic indicators;
  • the minimum angle of inclination of roofing rods. In this case, the four-sheet roof system allows you to adjust the length of hanging lag. These elements help make an additional canopy for the veranda;
  • aesthetic type of residential building. The house acquires smooth and streamlined lines.

The following reasons include disadvantages:

  • complex installation. Make such a roof yourself, you can, if there are special skills;
  • high consumption of building materials. To create a hip roof, you need to make four slopes that require additional marking and deformation of roofing;
  • requires the construction of an attic space. If you neglect this requirement, the risk of partial collapse of the built-up structure increases.

Four-sheet roof with her own hands

How to make a four-tight roof with your own hands? We bring to your attention detailed instructionswhich will help the correctly erect this design.

It includes:

Calculation of a four-page roof. This manipulation allows you to correctly calculate the number building material, Distances between carriers of lags and the angle of inclination of the roofing coating. The roof area will be slightly larger than the width of the ceiling span.

Four-sheet roof drawings. Here are detailed calculations and additional elements for fastening the carriers of the lag.

Erect ceiling overlap. To do this, use dense wood, which is fixed at a distance of 50 cm from each other. Next, lay a layer of waterproofing, which will prevent the appearance of mold and excessive humidity in the room.


On the concrete Walls Install metal reinforcement. It will continue to mount the beams.

Now proceed to the construction of beam spans. They are fixed with metal corners and mortgage anchors. When installing, it is important to follow the angle of inclination. For classic dutch roof 45-50 degrees must be observed.

Next, proceed to the manufacture of an attic space. It will be located in the center roofing design. For this make rectangles from a dense timber. For the roof of 50 m2, 4-5 elements will be needed;

The frame from the beam will be based on the upper boundaries of rectangular structures. Beams must form an angle in 45 o at the top point. All elements are fixed with anchors with plastic nozzles.

When the frame is completed, go to the roofing flooring. Here you can use a metal profile, or soft tile. The photo of the four-tie roof shows a workflow.

Photo of a four-tie roof

The problem of choosing the most successful roof frame device is always accompanied by two contradictory desires. It doesn't matter what kind of building is planned for construction, any developer would prefer to get the most pretty, durable and durable design, with relatively low costs for its construction. The most fully qualified requirements are answered by the four-tie roof of the rafting system, which is one of the optimal design solutions for the housing stock.

Advantages and disadvantages of using four-tight roofs

Even a surface glance at a four-tight roof system suggests that such a truly frame system of two pairs of symmetric slopes will look much more elegant and prettier than simplified dual-tissue design.

It is clear that most of the future customers prefer to build a rafter system for the house not only because of the more interesting design, although the factor of the appearance of the construction is also important. First of all, this design solution is chosen due to tangible advantages. four-page system:

  • The use instead of the roofs of two additional opposite rods reduces the wind load on the entire design of the solo system;
  • Installing two additional inclined surfaces makes it possible to delete and reset roofing cake Any amount of rainwater, snow and ice, the most dangerous type of moisture - water condensate;
  • The use of the roof of the four-page system allows to reduce heat loss by reducing the total area of \u200b\u200broofing and frontal surfaces.

Important! The roof in four slopes cannot be built "on the eyes" and the fit method, therefore, before making rafters on the roof, the sizes of the rafting beams of the four-page system are necessarily calculated on the tables and check the lengths and corners of the docking before performing the guilt and assembly.

The four-tie truck system is a balanced design, in which the loads entering the roof frame from roofing cake, snow and wind are mutually compensated as in the card house. If you try to assemble a frame without careful design training, instead of maximum strength and stability, you can get an emergency object.

The disadvantages of the four-page rafter system is also enough. Most often, the problems arise due to the need to take additional measures to protect the joints on the cutting line. In addition, it will take 30% more roofing material, insulation and expensive long bar.

Options for fourth roof circuit

In addition to the classic option, in which two triangular and two trapezoid planes are used, the roof of four slopes can be built on one of the skeletal types:


All modifications of the four-tie or hip circuit are calculated on specific climatic conditions of the roof. For example, Danish roofs are well opposed to the wind and a large number of snow, while "Dutch" is designed to resist heavy rains and snowfall in urban development. Tent schemes with small slope angles are used for buildings on open windy terrain. The classic option can be used for any conditions, but in this case it will take carefully to take the position of the building relative to the wind roses.

Construction of a rapid frame of a four-tie roof

The easiest way to understand the device of the rapid system of a four-page roof according to drawings. In a conventional two-tie design, the weight of the rafter beams was partially transmitted to the ski run and on the brusade strapping of walls or Maurylalat.

Balanced the two roof slide relatively simple, the usual fit of the rafter and the installation of the troops.

In the four-page rafter system, everything is much more complicated, therefore, in addition to ordinary rafters, in the roof frame, you have to use a much larger amount of power elements:

  • Costed or diagonal rafters. With their help, the side rods of the roof are formed, the rainstream system is equalized in the direction along the main axis of the roof;
  • Central rafting beams. Often the strength and stability of the diagonal rafters becomes not enough, especially on large roofs, so you have to use central rafters installed on one axis with a skate run;
  • Nonocents are short rafters forming the side rods of the roof. The length of each narigin is calculated and cut off at the place of installation raftered on the frame.

In addition to the rafter elements, when building a four-tie roof, Sprengel, soils and struts are used. With their help, the load and redistribution of the load in power elements Roofs.

For your information! It turns out a rather complicated multi-element design, in order to take into account all the requirements for the strength and stability of the rafter system, it is best to use a ready-made software package, even the easiest.

Of course, you can build a truly system and without any design and calculation. For example, a timber and an increased cross section board can be used, and instead of the recommended strength coefficient of 1.4 units to get two or three-time reserves on the bearing capacity. But it is worth understanding that in this case the weight of the rafter system and the cost of the fourth-tip roof will increase in 3 and 8 times, respectively.

Methods for calculating lengths of the four-tie system

For the simplest buildings, such as gazebos, a barn or a small garden house, you can use a simplified option for calculating the lengths of the rafting beams. To do this, you will need to draw up the drawings of the rapid fourth roof system. To simplify the calculation, choose a classic option with two side triangular hips and trapezoidal main skates.

The basis for the calculation stropile design The roof is a system of rectangular triangles. Each raftered is a rectangular hypothen. The smaller cathe is equal to the height of the skate racks, and the larger coincides with the projection raftered to the plane of the ceiling overlap, which is also called the embedding. The line of projections intersects with axial or projection of the skate beam at an angle of 45 o, which greatly simplifies the calculation.

Initially, it will be necessary to choose the angle of inclination of the slopes, usually it is 20-35 o, depending on the design of the four-sheet roof and the type of roofing coating. For calculations, you can use the Pythagora theorem for a rectangular triangle or standard tables with ready-made sling length recalculation coefficients for specified angles. In such tables, the angle value is indicated in the form of a decimal fraction, for example, 3:12. This means that at a given angle and the length of the attachment of 12 m, the height of the rack will be 3 m. Here is the coefficient of recalculation for the diagonal rafter, it is sufficient to multiply the length of the attachment by the value of the corresponding timetable amendment.

At the first stage, we define the coordinates of the installation of vertical racks of the skate and its length. To do this, measure the distance from the angle to the point of intersection of the axial line and Mauerlala, then we put the resulting segment from the angle along the axis of the skate and carry the line parallel to the wall. The axis intersection point and the line will give the place of installation of one of the skate racks. A similar procedure will be required to be performed again on the opposite wall, as a result we obtain the point of installation of the second rack and the length of the skunk beam.

At the second stage, using a construction plumb, you will need to measure the line of the diagonal rafter, knowing the angle of the slope, you can calculate the length of the hosted rafting beam. Similarly, the length of the ordinary and central rafters is calculated.

A little more complicated is the calculation of these aurities. First, the diagonal rafal beam is placed a step of installing nariors, as a rule, it is 70-90 cm. Each narigin can be viewed as a triangle catat. Knowing the size of the category and the height of the point of the adjoining of a narrower to the diagonal beam, you can easily calculate the size of the nunroot rafter.

If shprengel is used in the design of the four-page roof, the magnitude of the diagonals is used, then their value can be calculated even easier. Most often, they are installed at a distance from an angle of 1/3 on the downstream length.

Features of the frame of a fetal roof frame

The process of assembling a rapid system of a four-page roof always begins with the installation of the central frame element - the skate run and vertical racks. The skating bench can be collected from a bar, a cross section of 70x100 mm, but most often the racks are made from a 25 mm paired board. To increase the rigidity of the entire skunk beam system and racks, metal plates are stuffed on the angular joints, and the frame itself is enhanced by the inner strut.

Typically, the assembly of the rafter beams is performed on nails, and the expansion places with steel linings are fixed with bolted compounds. Before putting the rafter beams, a digging pattern is usually made in the form of a rectangular triangle from plywood sheet. The sharp angle must correspond to the corner of the slope. With the help of the template, the railway platforms for supports on Mauerlat and Konk are cut on the rafters.

The installation process of the rafter begins with the installation of central rafting beams, which will provide the necessary rigidity of the skate frame in the axial direction. Sometimes they do without them, in this case immediately go to the installation of extreme pairs of ordinary rafters, but the timber is only grabbed by nails, without final fixation to the skate.

After amplifying the ski frame, the angular diagonal rafters are installed. Typically, the length of the timber or beam is cut out with a reserve, since the upper edge will need to be styled at a double angle, first at an angle of tilt the slope, after the oblique edge is mounted at an angle of 45 o. At the last stage, they put Shpregel, the pitchpiece, nickels and ordinary rafters.

Conclusion

The most difficult stage of assembling a rapid system of a four-tie roof is the docking of two diagonal beams with a skate. From how far exactly the insertion of the diagonals is performed, the strength and stability of the entire four-sheet roof depends, so most time has to spend on fitting and trimming sizes of rafters. The rest of the assembly operations is practically no different from the construction of a two-tie rafter system.

Final construction element The buildings should not only reliably protect against precipitation, maintain heat, but also emphasize architectural advantages. The form is classified by: angle of inclination (flat, pitched); availability of arches, domes; the number of external and internal ribs; The number of planes (skates). The harder the system, the most likely, it will have to hire a construction team. It is necessary to choose not the easiest option, but interesting from the point of view of design. Four-sheet roof is an ideal solution.

Types of execution:

  • Walm - consists of two triangular slopes, resting by the vertices at the end of the skate. Two other planes - trapezoids.
  • The half-haired - differs from the first execution by the fact that part of the inclined surface occupies a fronton. The roof of one or two planes has a shortened appearance. Tested smaller wind and snow loads. Another plus is the ability to install full-fledged windows or balconies in the field of frontons.
  • Tent - triangular slots converge at one point. The use of such a decision is suitable for the house with the same size of the external walls.

Features of four-sheet roofs:

  • A more uniform distribution of the load on the foundation, throughout the perimeter.
  • The reduction in the amount of attic space is to reduce heat consumption for heating, complexity of the organization of the attic room.
  • Good confrontation with wind and snow loads.
  • Higher stiffness of the structure by increasing the number of external ribs.

Nuances of a four-page roof:

  1. In the end of the skate bar, the central intermediate and diagonal rafters are converged. The organization of the node is quite complicated.
  2. Mountain rafters are attached to the corner.
  3. It is necessary to power the angle of inclination of the elements to create a plane for the installation of the roof.
  4. The bias of the angular rafter is always less than the central and intermediate. This is the longest element.
  5. Support serves Mauerlat and the ski run.

Instructions for the choice and calculation of the rafter system

The construction of the house begins with the design of the project. Independent drawing development is impossible without:

  • study of construction technology;
  • farm calculation.

Factors affecting the choice:

  • the angle of slope;
  • walm roof material;
  • the weight of "roofing pie";
  • wind and snow loads;
  • seismic danger;
  • overall dimensions of the house of the house, the presence of inner bearing partitions, columns;
  • planning the organization of an attic room.

The slope slope will be determined not only from aesthetic considerations. It is important to find golden middle Between the positive visual perception and preservation of reliability, design functionality. The magnitude of the angle is closely interconnected by almost all the above factors:

  • The use of all types of roofing materials is limited to the range of this parameter.
  • The less the angle of inclination, the insignificant effect of wind load.
  • An increase of up to 45-60 ° guarantees an independent approach of precipitation. The impact of snow cover is minimized.
  • Reducing the angle of inclination, we obtain a decrease in the area and weight of the entire system. Falls the consumption of thermal energy to warm the attic space.
  • Organization mansard floor Unlikely at a low inclination.

Types of rafter farms

1. Wissing - the design of the holm roof is performed with a support for:

  • external walls (Maurylalat);
  • run (skne);
  • on the internal bearing partitions, the columns inside the house through the litter.

The load distribution occurs due to the installation of additional racks under the ski bar. Lena shares pressure over the entire surface internal partition (columns).

2. Hanging - used for buildings with a maximum foundation size up to 6 ~ 7 meters. The rafters are based on the walls. Load distribution using racks, tightening, riglel, dyspnosis. For hip roofs, this kind is rarely used.

Instructions for calculating the rafter system

The fulfillment of the drawing of a four-sheet roof is impossible without making mathematical calculations.

1. The size of the run is determined on the basis of the dimensions of the house. Standard solution: The length is minus the width. The middle of the skate bar is located clearly over the intersection of the base diagonals. Rock line parallel to frontal walls.

2. Skate height: H \u003d B x TGα. B is half the length of the end walls of the house, α - slope slope. The numeric value of Tangent is determined by the Bradys table.

3. The size of the central and intermediate rafters of the skate: LCTR. CATT \u003d √ (H² + B²).

4. The length of the central rafting feet of the hip: LCTR. Ralm \u003d √ (N² + B²). With a non-standard selection of the size of the skate, the value of B is defined as half the difference of the length of the house and run.

5. The size of the diagonal elements: LDGN. \u003d √ (LCTR. Ralm² + B²).

6. Calculate the lengths of these triangles is used - the property of such triangles is used. If the angles are equal, one of the parties is the proportion of lengths, the ratio of the remaining components of the figures will be observed: D \u003d 3/4 C, it means: Lar \u003d LCTR. Ralm x 3/4.

7. The distance between the rafyles depends on the choice:

  • Size size, wood quality. The weaker material, the less should be a step.
  • The presence, the type of thermal insulation layer - is determined by the convenience of installing the insulation (60-120 cm).
  • Roofing material, its weight and geometry. The greater the total mass, the less step. As with thermal insulation, leaf dimensions take into account.

The minimum step between farms is 60 cm, maximum - 2 meters.

8. The formation and calculation of the soles depend on the preferences of residents and the height of the house. The minimum size for a 1-storey structure is 500 mm. The task is to protect the walls from atmospheric precipitation.

Building a holm solry system

Mauerlat - Bar or Upper Crown, a home strapping to which rafters are fixed. Provides uniformity of the distribution of the load on the outer walls. Section: 10x10 cm ~ 15 * 15 cm. Armopoyas - concrete reinforced construction on the upper perimeter of walls. His task is to strengthen the base under Mauerlat, to ensure a reliable coupling with the roof.

Maurelat installation options:

  • On the reinforced concrete belt using mortgages, anchors.
  • Anchors in the body of the wall - brick one-storey houses With a slight bias of a hip roof.
  • On the last crown of a wooden log cabin or upper strapping frame structure.
  • Installation on studs laid in brickwork.
  • Brackets scored in wooden liners inside the brick wall and the body of Mauerlat.
  • Wired from the neaned steel, laid at the time of the construction of the facade.
  • On the heels, fixed in the wall by a chemical anchor - two-component composition. Glue introduced B. drilled holes In the laying of the house, hidden, reliably holds the element.

Features:

  • The number of studs, brackets, anchors should be greater than or equal to the number of rafting legs.
  • Under the timber fit or applied to the base of bitumen mastic.

Installation Guide:

  • Marking of holes for heels, anchor is carried out by laying the rails on the fastening elements, followed by a blow on the surface of the tree. On notching is drilled. The bar is dressed on the studs, fixed with a washer and nut.
  • Wire connection - Ends are passed on top of the slats, make a twist.
  • Schemes of extension in long sections:

  • They carry out the laying of the ceiling beams either on the same level with Mauerlat, or on the bar, fixed to the wall. Step - 0.6-1 meter.
  • The screed of Mauerlat by the rails, to which the racks will be fixed in the future.
  • After completion on the surface of the Mauerlat, the layout of the arrangement of the rafter.

Installation of runs

The skiing timber is experiencing significant loads, installed on the rack. The correctness of the work depends:

  • Symmetry of construction, uniformity of weight distribution.
  • Reliability of a four-tie roof with maximum wind and snow loads.

Brief Installation Instructions:

  • The scheme (hanging, mounted) depends on the presence of internal supporting partitions. Fastening racks can be to screed or overlap.
  • In the houses with large sizes, the design must be strengthened with pins to ensure the resistance to the loads.
  • The material for the skate and the supports are chosen the same cross section, not less than 100x100 mm.
  • Before work, it is carefully measured and determined by the central and extreme points of fixing racks. The amount of run is affected by their number. Step - no more than 1 meter.

Install rafted with your own hands

There are two orders of work:

  • First, the central rafters, then diagonal. Nonocents are installed last.
  • Installation of diagonal elements, after that - central.

The first method is considered simpler. The second allows at the initial stage of work to monitor symmetry.

Mounting options to Mauerlat:

  • Hard - in the rafters performed was carried out, the depth of which is not more than 1/3 of the width of the bar. Deepends (saddle) can be cut according to the template.
  • Sliding - applied to facilities giving shrinkage. For fixing to Mauerlat, special fasteners are used, floating supports for rafters. With this method, the foot connection over the skate is performed by a hinged method.
  • Crowing - the end of the rafter relies on Mauerlat. Rights of the hollow roof are made up by increasing the legs with additional cross sections (lifting) of the legs. This method saves on the material.

Registration of the skate assembly of the central, intermediate opposite rafters:

  • Job is a connection with the cutting of the end of the legs at an angle. Coming cross sections. The node fastener produces nails. Additional fixation will provide a metal plate or wooden pad.
  • Vancest - rafters are superimposed by each other side surfaces. Fastening - hinged (bolt), nails.
  • To the skate blade - docking of the cross section of the rafted with the side surface of the run.

Diagonal foot mounting features:

  • The placement of the upper node with the stop of the cutting rafter to the side surface of the central elements of the system.
  • To enhance the diagonal legs experiencing the greatest load, the installation of shrgel farms is required, racks.

Installation of narinses to diagonal rafters are carried out by docking and docking with its side surface, fixation with nails.

At the end of work, it is necessary to check the equality of the angles of inclination and the lengths of the opposite rafters, compliance with the plane of the rods and the valves.

Nuances and possible errors

1. By purchasing lumber, you need to make sure that:

  • The moisture content of the tree does not exceed 20%. When drying, the board changes geometry, which will lead to a change in lengths, rectinence. Violation of proportions entails flowing, reducing the resilience by wind and snow loads. The best quality in wood, harvested in winter In the regions with a cold climate. Before making a purchase, contact the seller asking for moisture measurement.
  • There are no cracks in the body, ingrown knocks, traces of insect vital activity.
  • By purchasing glued bar, make sure that the seller's decency, the manufacturer. The use of poor-quality products will lead to a violation of strength.

2. Elements of the rafter system can be ordered in enterprises with a specialization in the construction and manufacturing of turnkey houses.

3. The wood before starting the installation works is treated with antiseptics and antipirens.

4. The length of the acquired rail sometimes does not correspond to the calculated size. Extension technology:

  • Spit river with maximum fitting of mating planes. In the through hole, the bolt or heel is inserted with tension, without a backlash; Spin the nut.

  • Vangest is more than 100 cm. Conducted with nails, bolts, stagnation spills.

  • Job in cross section - dug under 90 °. The place of docking from opposite sides is overlapped with overlays. Fastening - as in the previous method.

5. Nodes are additionally fixed with metal fasteners: angles, plates and others. Each of these elements has holes for hardware. It is advisable to apply products with oval slits that allow minor displacements of mating surfaces. In the process of shrinkage, the exposure to loads may occur a risk of a hard connection.

  • Lack of calculation of loads, weight. Excess valid indicators entails the destruction of the foundation, the roof frame. The required calculations can be performed independently or applying online calculators. Attracting specialists - the most correct decision.
  • Step exceeds the calculated value. Saving on materials, the master will acquire many problems.
  • The plane is not controlled and the hip with the cord. Deviations will cause roof sagging, the tightness and reliability of the roof will disturb, right up to its deformation.

Four-page roof with her own hands: drawings and photos below.

How the four-tie roof is mounted

Drawing plan of the rafter system

Installation of crates, vaporizolation, waterproofing

The arrangement of different layers of a four-page roof requires a careful attitude towards each stage of work.

Each layer stacked its function, all layers in aggregate form a unified systemwhich ensures the protection of the facility.

Laying the crates

Doom - wooden designconsisting of bars located across the rafter feet. The optimal cross section of the bars of the crate - 50x50 mm.

Before mounting, the crate board requires antiseptic processing.

The crate is mounted either with a solid layer or a step of 100-150 mm (depending on the external coating).

Bashed the crate of nails.

Installation of crates

Installation of vaporizolation

Vapor insulation film is set in order to prevent moisture from entering the heat insulation layer. Parosolation film is attached to the brackets of the brackets of the bracket. The places of adhesion are stuck with scotch.

At the same time, it is necessary to ensure that the film fits tightly to the boards. In places of pipe equipment or windows, rubber or polyurethane adhesive tapes can be used.

CAUTION!

A vapor barrier material should not ride the clashes boards to prevent the formation of places for water accumulation.

Water pairs have a high penetrating ability, so installation of vaporizolation - a very responsible stage of work.

Installation of vaporizolation

Installation of waterproofing

After mounting the insulation laid waterproofing. Waterproofing does not miss the moisture accumulated in the underfloor space inside the roofing pie. As well as thermal insulation film, waterproofing laid mustache and joints are sick.

It is especially important to properly lay the film in the skunk part.. The skating region is most susceptible to cluster of condensate vapors.

The importance of each stage on the installation of the roof of a holm roof cannot be underestimated and even more so to refuse to install any element.

Installation of waterproofing

Walp roofs are considered the most durable and durable. They were installed more than a hundred years ago, and such structures have proven themselves as reliable and hardy.

Despite the complexity of the design, installation of it can be done independentlyThe main thing is to perform a step by step in a clear sequence every stage of work and choose high-quality, reliable material, because the roof should protect the house not one dozen years.

Useful video

In this video you will learn how to build walm roof do it yourself: