House, design, repair, decor. Yard and garden. Do it yourself

House, design, repair, decor. Yard and garden. Do it yourself

» Siberian boilers. Boilers and furnaces on solid fuel "NMK Siberia"

Siberian boilers. Boilers and furnaces on solid fuel "NMK Siberia"

bestseller

39 000.00 rub.

Delivery

  1. Delivery in Moscow and the Moscow region is made within 1-2 days from the date of order, courier or motor vehicles of the company. The cost of delivery depends on the destination and urgency, and is clarified by the manager. If the delivery coincides with the scheduled schedule, delivery is free.
  2. Delivery to the regions of Russia is carried out by companies by carriers (business lines, autotrading or any other company at the request of the customer). Shipping cost in accordance with carrier tariffs, delivery to the terminal in Moscow for free.

Sibiryak-15 is a new generation solid fuel boiler, designed and manufactured in accordance with the requirements of the Cold Russian Winter in the Russian enterprise in Omsk, meets all modern standards.

Solid fuel steel hot water boiler "Sibiryak-15" applies in heating systems as open type So in closed systems with forced circulation. Due to the increased fuel combustion chamber, it can work up to 2 times longer on one fuel load than existing analogs.

The "Sibiryak-15" boiler is an all-welded construction of high-quality steel 5 mm thick. The cover of the boiler consists of a metal sheet with heat-resistant coating and layer non-combustible insulationproviding excellent heat insulation of the boiler. In the furnace there is an additional efficient heating surface - a water-cooled grate grid. This increases heat transfer and reduces the convective heat exchange surfaces. As a result - resistance decreases flue gases In the boiler, and he becomes unpretentious to chimney.

For the boilers "Sibiryak-15" the main fuel type is wood and coal. The approximate interval of adding fuel into the boiler depends on technical parameters Systems of heating, type and quality of fuel and ranges from 5 to 7 hours.

CHARACTERISTICS

Power range, (kW) 6 ÷ 16.
Chimney pressure, (PA) 15
Water volume in the boiler, (l) 33
The temperature of flue gases at rated power, (° C) 230
Combustion chamber volume, (L) 62
Fuel consumption (birch firewood with humidity 15%), (kg / h) 3,5
Fuel consumption (brown coal), (kg / h) 2,1
Operating temperature range, (° C) 40 ÷ 90.
Minimum water temperature in the reverse line, (° C) 65
The size of the top door, (cm) 22 × 44.
The surface area of \u200b\u200bheating, (sq.m) 1,38
Diameter of chimney, (mm) 133
Height of the chimney, (m) 6 ÷ 7.
Mass of the boiler, (kg) 175
Boiler efficiency, (%) 71
Maximum working pressure, (PA) 2,5
Maximum length is full, (mm) 550
Total boiler width, (mm) 600
Total boiler height, (mm) 900
Total depth of boiler, (mm) 960
Chimney connection height, (mm) 660
Height between the connection of the chimney and the feed line, (mm) 144
The height of the reverse line, (mm) 150
Diameter of feed line and reverse line nozzles, (G) one"

Related products

vendor codeNamePrice
123 610 rub.
73 700 rub.

We carry out delivery in Russia and CIS countries. All goods in the company "New City" are released at the price of the manufacturer's plant.

Advantages of Siberia boilers

1. Compactness. The boiler dimensions allow you to install it in almost any premises.
2. Efficiency. Specially designed boiler design allows you to maximize thermal energy When combustion of fuel.
3. Informativeness. The water temperature in the boiler shows a bimetallic thermometer built into the housing.
4. Using the Tan Block. The possibility of connecting the TAN with the thermostat allows you to leave the boiler for a long time, while it will automatically turn on and will maintain a positive temperature in the heating system.
5. Durability. The uninterrupted work of the boiler is guaranteed for ten years.
6. Technologicalness. Due to the introduction of the water grade, the maximum heat transfer was achieved by the carrier and the rate of heat transfer to the system was increased. Also, the boiler is finalized and has an automatic thrust control, which allows you to automatically maintain a comfortable coolant temperature. This boiler is suitable for closed system Heating. It added an additional door in the furnace chamber, allowing to reduce to a minimum of heat loss.
7. Presentable appearance. Visually, the boiler looks in the spirit of time, has a pleasant color solution and stylish design.
8. Ease of operation. The design of this boiler is made with the most convenient location of the elements, significantly improving its ergonomics.

Thanks to the abnormal zone, which the Siberian boilers in Yakutia are created, a place appeared, which for many times the valley of death has been called. Despite the development of mankind, today, as before, tourists, researchers and journalists do not retreat from the desire to see and solve this mystical mystery.

Death Valley and its Siberian boilers

According to the main sources, the valley of death is an abnormal zone, which is located in the Vilyuh River valley. This mysterious place is located in the Mirno Ulus of the Republic north of the reservoir. The place received its unusual and terrible name thanks to the deaths that took place with hunters from these places. It is here that are so-called siberian boilers.

Local inhabitants, reinforcing their own stories with real facts, drawings and biography, tell me how in this abnormal zone hunters used some bronze boilers of huge sizes as overnight, after which terrible things happened to them. Upon arrival home hunters were very ill and even dying. People saw that if we spend the night in the boiler twice, in the near future a person dies. But why? What provokes the death of a person in this zone? We will try to give these and many other questions.

History and secrets

The first time in history was mentioned about the valley of death in the mid -19 century. The researcher and naturalist about it about it, and just the grand identity of Richard Mac. Starting from 1853 to 1855, he conducted many studies here, including in basins of rivers such as chon, Vilyui and Olekma. In addition to learning the relief and reservoirs, he also spent a lot of time, knowing local unusual peoples who settled this wild edge.

Studying the notes of the researcher, it became known that near the Alga Timirby River, which in the translation sounds like a drowned big boiler, is really an object that is like a boiler in its form. The subject is made completely out of copper. Its exact dimensions are unknown, since most of it is in the ground, but are known that trees and minor shrubs grew up in the boiler itself. From this we can conclude that this boiler is just huge sizes. After Richard published a book, an unusual place and a boiler found out the whole world, but equip a whole expedition to such a complex area for one metal subject In the form of a boiler, no one decided.

It has also been proven that in 1971, local UFologs witnessed the documented story of a local old-timer - a hunter who told about the terrible valley of death. He confirmed the fact that between the two rivers Nuregun and Ataradak have a huge metal containerin which the remains of people in the ironwear are lying. But neither one local resident will not dare to come closer to the boiler or climb.

As a rule, no tourist is not solved for this, the price for ordinary human curiosity can be great. And, no matter how to try to explain all things scientifically, smoking the world, you realize that there are holy places and damned things that cannot be explained by scientifically, and the rites of the ancient peoples that they break all the laws of physics.

How to get to the Valley of Death

The river is located 103 km from the city of Mirny. Every day drives the train to Vileyka. You can also get by train or bus. In an abnormal zone, as a rule, tourists take with them navigator. But remember that all the electronic items from time to time are failed here.

Hello! My name is Ivan Davydov, I am a manufacturer of automatic coal boilers, maybe many know me in absentia ( The simplest coal-machine do it yourself , Jenesh boiler Gorynych , Brous house, Boiler based energy-TT) - My published work. ads: Budget 22 Kilowatta, Screw at 25kilovatt, Screw for 35 kilowatt, 30 litter Kilowatt, 80t kilowatt.

I invite you to take part in the development of a screw coal boiler in the role of the buyer - at cost in the amount of 100 thousand rubles, owners of houses ranging from 70 to 200 tons of square meters (15 kilowatt in denominations). This model is younger brother Screw for 25 kilowatt,

Pluses of this boiler:
1. Rare cleaning heat exchangercompared with similar screw boilers and long-burning boilers, for example my boilers easily export the entire heating season without cleaning (but in fact any boiler must be cleaned at least once a month - only not all manufacturers reach the 1st week):

2. "Endless" reverse auger when jamming (With a jam, a reverse occurs - several feed attempts - if the auger cries, then the work continues if it does not specify, then after a while again trying to give coal again);
3. Big box for ash and slag. In stock (no extra charge for increasing the ash compartment and the drawer as others)
4. Torch burner not bakes cakes On any coal (stone, brown), and if baken, then it comes in.
5. The torch burner of small sizes (the portion of coal on the burner is minimal) - during the off-season in the "Stop" - bitumen resins stand out at leastThe heat exchanger does not tarnish.
6. In the bunker "You can write coal and straight with frost and partly with snow (not to dry in the boiler room like others) nothing hangs, but still in the boiler it is necessary to pour the dry coal fraction;
7. Notcribed to the fraction Separate large pieces will turn into "seed and nut" - a powerful gearbox and auger cope with this task with a bang;
8. No shponka does not cut off - It is simply no ... just reliable protection in current copes with its task.
9. When the electricity is turned off, you guarantee that the boiler itself "starts" through 6t hours when resuming power.
10. Boiler without decorative linings - will additionally to wash the roomin which it is worth (car service, boxing, garage, those floor under the house). And when installing the boiler in a separate boiler room, it will additionally warm the murous coal fastened to the bunker.
11. Spacious bunker, 215 liters. Fully sealed - floating in the bunker subject to the closure of the bunker cover - it is impossible.
12. Non-killed doors, handles and seals on them.
13. Reliable gearbox;
16) Valler (Sewber) Adjustable on chimney, in the case of the February winds - a decrease in thrust.
17) Easy to withstands a large pressure in the system.
20) The boiler is very compact (1200x800x1500 - Width x Depth x Height)

21) With this boiler already average woman can be managed.

Cowles of the boiler:
1) The possibility of jamming the auger - still remains ...
2) When the auger is jammed, the coal supply is completely stopped and the boiler begins to lose the temperature rapidly, unlike other my boilers, which are not enough that they do not climb - duck, and during the encinsing continue to burn from 6 to 12 hours;
3) If desired, the use of a boiler as "energy TT" either in the "burning" mode is needed - additional uninterrupted source Nutrition ... either harvest emergency cooling unit;
4) Steel burner in the boiler - enough for 2 years of use, but they are 2V in the kit;
5) Highly will have to lift the veser when loading the bunker - the floor loading hole at an altitude of 1500mm.

From the author: The last 3rd years does not leave me the thought of doing a truly budget automatic boiler - a lot was made since the times of various boilers.
So once again, while the winter in the yard - attempted for six months, began to prepare for the creation of a boiler with a novel by Kuzin from the city of Rubtsovsk, one of the major energy producers TT in Russia, constructive solutions to think over. I collected the power of will in the fist, and I went to visit the boiler to draw, cut, cook, test. And that I want to say it turned out 2nd of completely new model classes - combined best Solutions My and Romines - found a compromise. We sat for a week, without departing from laptops and computers from 8:00 to 24:00 Nights Yes, they made a 2nd racing models, so while 2nd in the stage of manufacture - the first decided to lay out, tests on the stand of this boiler in a week.
So, I suggest: For the price of 80t.ru. I guarantee making a screw boiler for you, the boiler will have a bunker in the area of \u200b\u200b210 liters ... it works on the walnut fraction (0-50 mm), seed (15-25), pellets (6-10mm), on firewood when using a cast-iron grain over the burner . The flank box is enough for no less than 1 bunker ... the body of the boiler is twisted by Polish boilers and their analogues of the "local spill". Metal thicknesson the body of the boiler will be 3mm. In the heat exchanger will not be used horizontal sites - This design of heat exchange surfaces does not need weekly cleaning. The combustion chamber is elongated. The boiler is 1.5 meters high.
Budget boiler - lining will not.
All this is not Polish developments - this is my personal experienceWorked in practice ...
Boiler name: "Energy Auto".

3mm metal thickness is both an external and inner boiler shirt, there is an opportunity to make out of a thicker metal, or in general from a stainless steel - then the boiler should be enough for grandchildren. But all this costs extra money, and on the other hand in Ukraine make boilers Energy TT from 3mm - for 7 years there was not a single case of problems with the shirt of the boiler - and they are aggressive. Corrosion from oxygen in water is not as terrible as corrosion inside the furnace. If in the first case it is possible to achieve longevity with a rare shift of the coolant, then much unpredictable can be in the second case. Therefore, to avoid condensate in the boiler, keep the temperature at the outlet of the boiler at least 60 degrees. Well, the fact that some is thicker put, there is a controversial question and often this is done for marketing. So they say, we are thicker, which means better, fall))).

At the beginning of summer, he threw the cry on exactly the same help to me, on the model in the 30th kilowatt - was made different exactly 10th boilers, several different bunkers, bunker from 250 liters and up to 1,5 cube:


This bunker is small, only 600 liters turned out ... This 500 square house, a kilowatny boiler (as it was calculated, in fact it turned out to be in the area of \u200b\u200b45kW) eats this bunker in exactly 3rd days and seats under the ash in boxes exactly 3rds.


The bunker with a load from the street ... small on 400 liters. From the street, a pipe to Bunkera is welded - coal to fall asleep through the funnel, after frowning the coal, the funnel is removed and the cover on the pipe is closed.


A couple of pictures of the production process at the stage of assembling the boiler in 1 but a whole of a variety of different parts.


And so we drank 30 kilowatts on weekends, and the stock bunker on the 30th kilowatte boiler for 250 liters.


In several boilers was installed flowing water heater - 2VA contour of 15th meters ... with 9 liters consumption per minute - this eye consumption is enough for the most powerful tropical shower in the shower, so that the water at the outlet 50t of degrees is obtained at a constant flow rate, at the inlet + 6 + 10 degrees, temperature In the boiler 60t degrees.


1.5 cubic bunker - also a cool machine turned out.
All these boilers are already working ... at houses 250 squares and up to 500t, all 9 stranges out of 10.


So my daughter and I spent time in the workshop ... while my mother was waiting for from work. In welding gloves - so funny was obtained. So it did not work out to teach it cooking - probably it is a neleval case, as I think


The auger boiler left for Krasnoyarsk ... under the Logo Mountain -1.
It is necessary to go to the owner of the boiler, preach the boiler worker.


Also indulged ... I wanted this boiler to put myself on the table in the office? But the desire to flood him overpowered him ... I presented as an exhibit to the station Young technicians in our city.
Video work:


Gorynych-1 who went to Kazakhstan ... in the city of Karaganda - it turns out and in fact there is and I was there

Summary: All accepted participation Last time in the manufacture of 30 kilowatts boilers - at cost, satisfied left, now in frost all about enough bunker for 3ries day, in more warm weather, have grabbed for a larger number of days. The heat exchanger has yet been clever - we do statistics how the first boiler will be born - interesting.
And I was able to pay a more or less worthy salary to the boys, acquired invaluable experience, and I am very pleased - although I did not see money from the manufacture of data of boilers ... invaluable experience
Already there is some kind of work, this design of the boiler works great on our local coals - but the lack of a normal smoke engine - spoils the whole "buzz" - until I find the appropriate engine design to make this model I will not.


I will put my control blocks with screens from 2.8m to 7 inch - sensory. If the Polish counterpart cuts off the key during the encinsing, then I will not have this - during the encinsing it will be a reverse on the current - and the boiler will try to try the auger on your own for some time. Perhaps with such a system - there will be no specific snacking of a century ...
Prepayment will need 80t. Rubles. We conclude a contract, waiting for 1-1,5r months.
On the boiler will be a complete guarantee of 2nd year, for everything And after the warranty, I think everything will be solved in the case of anything.

I am geographically: Zheleznogorsk, South Street. My telephone: 8 -913 -043-04-28 Ivan..
…………………………………………………………...........Second number: 8-902-916-11-19

Introduction

The characters of our today's review - heating boilers Production of the plant "NMC" under the brand "Siberia". We will analyze in detail than they are distinguished from competitors and which there are flaws ..

Novosibirsk Plant "NMK" produces solid fuel boilers "Siberia" of two series "Hephaest" and "Quo". Let's analyze each of the models in turn and learn what advantages have these devices among Russian analogues.

Steel boilers on firewood and coal "Siberia" Quo

The "Quo" series was specifically designed for those who need an inexpensive household boiler for country house or cottage. The manufacturer tried to take into account all the wishes of consumers and create truly decent and universal heating device.

Photo 1: Copper with household tiles and a block of Tan "Siberia" Quo

A total of 5 sizes of Siberia boilers CVO 10, 12, 15, 20, 25 kW are produced. The main material for the manufacture is the heat-resistant steel, but some details are made of cast iron.

Siberia Series Quo This is a classic solid fuel boiler with a water jacket, but still in its design there are a number of features:

  • To increase efficiency, a water-tube grate grille is used. The grate of which occurs the process of burning fuel consists of pipes connected to a water jacket. This additionally increases the area of \u200b\u200bthe heat unit and thereby the efficiency of the boiler.
  • In the combustion chamber, on the way of movement of flue gases, there are transverse beams filled with heat carrier. As in the case of a grate grid, it allows you to maximize the use of heat from the combusting fuel and direct it into the heating system.
  • The boiler lid is cook surface From steel 12 mm thick with holes of various diameters for the installation of dishes. In essence, the Cabin "Siberia" Quo is a hybrid of the heating device and a kitchen stove. Also through these round holes in the lid conveniently fall asleep coal.
  • In addition to heating the coolant using the energy of burning wood or coal, there is a possibility of installing a Tan by 3 kW. It can be used to maintain the required temperature in the heating system at night or to prevent the freezing of the coolant during short-term departures from the house.

For the convenience of mounting and strapping each size, there are several options for the location of the flue gases and nozzles of the feed and reverse line. For example, no pipes can be on the left or on the right wall.


Photo 2: Boot Chamber of Steel Boiler Heating Siberia Quo

The principle of operation is no different from other traditional combustion devices, such as such as. Coal or firewood is loaded into the furnace and ignition occurs. Solid fuelBurning, heats the coolant in the heat exchanger. Through the supply line, the coolant enters the heating system, giving heat to the room, and then returns back to the boiler.

Consider the main characteristics of the CVO series:

Especially for the site we asked one of the owners of the Siberia boiler KVO to tell about the experience and nuances of its use, and here is his review:

Installed the Cabin "Siberia" KVO 10 TPE into his small country house. Immediately I will say, bribed the presence of a cooking panel, and the price for the pensioner is very affordable. He drove to firewood, throw up to approximately once every 5 hours, quickly roast. Would move to coal, but we have problems with him. In principle, the device is satisfied, quite acceptable quality for such money.

Igor Nikolaevich, Khabarovsk

As you can see outdoor boilers Siberia Quo is ideal for giving, due to the fact that it can be used not only as a heating device, but also as a tile for cooking. And if you visit the cottage only on the weekend, the beans will avoid the freezing of the coolant into your absence.

Back to the category

Household heating boilers "Siberia" Hephaest

Copper "Siberia" Hephaest - new in the domestic market of heating equipment. It is produced since 2014, but it can already be worthy competition to devices that have long been on the market, such as the total volume of three sizes at 15, 20 and 30 kW.


Photo 3: Outdoor solid fuel boiler with hob "Siberia" Hephaest

Like any other classic solid fuel boiler, Siberia Hephaest has a heat shirt surrounded by a water jacket. Under the grate grid is located a spacious Kolnik Box, to collect solid waste. The flue gases are removed through the nozzle in the rear of the boiler in the chimney. In addition to these, generally standard nodes, there are also some features:


Photo 4: Window vertical download Hepheshet TT Hephest TT
  • As reserve source Heating, there is the possibility of installing a Tan on 4 kW. It can be used to stabilize the work between downloads and to heal the heating system in the absence of the owner.
  • On the left and right walls of the boiler there are nozzles for feeding and returns for the convenience of installing and strapping. The unused feed line can be closed with a plug, and in the free pipe of the return, you can install a 4 kW block.
  • To control the combustion process, you can optionally install a mechanical traction controller. To install it on the front panel there is a separate output. The sensor measures the temperature of the water in the boiler, and, if necessary, opens or closes the zolnik flap, with a long chain.
  • To increase efficiency, grateproofs are filled with water. For the same purposes, serve beams with a coolant inside the boot chamber.
  • Under the top of the boiler lid there is a round hole leading to the furnace. It can also be used to load the boiler with fuel, as well as to install a pan or other kitchen container.
  • The housing of the boiler is covered with wear-resistant paint, and on the front panel there is a thermometer for visual control for temperature regime Solid fuel boiler.

Photo 5: Camera loading of a solid fuel boiler heating "Siberia" Hephaest

Siberia has been working in the same way as the usual. Let's go better to its characteristics:

On the thematic forum we found a branch with discussions of the Siberia line Hephaest, and this is what people say about them:

On the terrace of his country house put Hephaest 30 kW. House 180 m² from blocks, on windows windows. Heats normally, but there is no special heat. To throw up of course you often have, one saves the terrace nearby. In short, the device is not without flaws, but for such money, I think, it is better not to buy.

Anatoly Vladimirovich, Rostov

By the ratio of price-quality "Siberia", Hepesty is a pretty good model, and is suitable where budget is necessary heating system Not involving serious loads. In other cases, it is better to buy a more serious boiler.

As a video review, look at a small video from YouTube about Siberia Boiler Quo: