House, design, repair, decor. Yard and garden. Do it yourself

House, design, repair, decor. Yard and garden. Do it yourself

» Official instructions of the installer of technological pipelines 5 discharge. Official instruction locksmith

Official instructions of the installer of technological pipelines 5 discharge. Official instruction locksmith

JOB DESCRIPTION

installer technological pipelines 5th category

1. General Provisions

1.1. This job description defines the functional, duties, the rights and responsibility of the installer of technological pipelines of the 5th category "Pumping technologies" (hereinafter referred to as the installer of the 5th category technological pipelines) All-Russian Association of Employers "Russian Union of Industrialists and Entrepreneurs" (hereinafter referred to).

1.2. A person satisfying the following requirements for education and training is appointed to the post of assembly of technological pipelines of the 5th category.

  • Vocational training - training programs for workers' professions, employee positions, program retraining programs, employees;
  • with practical experience:

  • At least one year in the field of equipment installation pumping stations and water treatment stations in water supply systems at a lower (preceding) discharge;
  • Special conditions for admission to the work of the 5th category of technological pipelines:

  • Passage of labor protection instruction in established by law Russian Federation order;
  • 1.3. The installer of the 5th discharge technological pipelines should know:

  • Rules of lines and movement of goods;
  • Types of pumping stations and water treatment stations in water supply systems, main nodes, technological equipment and their functional purpose;
  • Building regulations;
  • Methods for connecting equipment of pumping stations and water treatment stations in water supply systems to technological pipelines;
  • Montage Rules I. technical exploitation installed equipment of pumping stations and water treatment stations in water supply systems;
  • Labor protection requirements;
  • Requirements for regulatory and legal acts, regulatory and regulatory documents on the installation of equipment of pumping stations and water treatment stations in water supply systems;
  • rules safe operation equipment pumping stations and water treatment stations in water supply systems;
  • Various types of equipment pumping stations and water treatment stations in water supply systems;
  • Sort of materials and equipment used in execution mounting work in pumping stations and water treatment stations in water supply systems;
  • Requirements made to the quality of work on the installation of equipment of pumping stations and water treatment stations in water supply systems;
  • Installation technologies for pumping stations and water treatment stations in water supply systems;
  • Requirements for the rational organization of labor in the workplace;
  • Rules for conducting tests of mounted equipment pumping stations and water treatment stations in water supply systems;
  • Labor protection requirements;
  • Instructions for using instrumentation required for testing stations and water treatment stations in water supply systems;
  • Appointment and instrument of instrumentation required for testing stations and water treatment stations in water supply systems;
  • Building regulations;
  • Regulatory water supply documentation;
  • Methods of controlling the quality of work performed on the installation of equipment of pumping stations and water treatment stations in water supply systems;
  • 1.4. The installer of the 5th discharge technological pipelines should be able to:

  • Use a manual and mechanized tool required for mounting pumping stations and water treatment stations in water supply systems;
  • Apply rules defined by the installation instructions for the equipment of pumping stations and water treatment stations in water supply systems;
  • Use modern technologies performing installation work of equipment of pumping stations and water treatment stations in water supply systems;
  • Read working documentation and work project, reflecting issues of installation of pumping stations and water treatment stations in water supply systems;
  • Comply with the requirements of labor protection, fire and environmental safety when performing work on the installation of pumping stations and water treatment stations in water supply systems;
  • Use the equipment necessary for testing when installing pumping stations and water treatment stations in water supply systems;
  • Produce work on the installation of pumping stations and water treatment stations in water supply systems in accordance with technological processes and technological documentation;
  • Use control and measuring instruments and tools necessary for the installation of pumping stations and water treatment stations in water supply systems;
  • Conduct testing stations and water treatment stations in water supply systems in accordance with the techniques;
  • 1.5. The installer of the 5th discharge technology pipelines is appointed and exempt from office by order of the managing director of the management of the development of the institution in accordance with the current legislation of the Russian Federation.

    1.6. The installer of the 5th category technological pipelines is subject to the managing director of the management of the development of the institution and the head of the "pumping technologies" division

    2. Labor functions

  • 2.1. Installation of equipment of pumping stations and water treatment stations in water supply systems.
  • 2.2. Testing of installed equipment of pumping stations and water treatment stations of water supply systems.
  • 3. Official duties

  • 3.1. The installation and installation of equipment of pumping stations and water treatment stations in water supply systems.
  • 3.2. Checking the availability of space for the installation of equipment of pumping stations and water treatment stations in water supply systems.
  • 3.3. Study working documentation and instructions for installing equipment pumping stations and water treatment stations in water supply systems.
  • 3.4. Implementation of assembly work on the purchase of equipment of pumping stations and water treatment stations in water supply systems with technological pipelines.
  • 3.5. Places of installation of equipment of pumping stations and water treatment stations in water supply systems.
  • 3.6. Drawing up necessary executive documentation When installing pumping stations and water treatment stations in water supply systems in accordance with the requirements of the legislation of the Russian Federation.
  • 3.7. Comparison of test results of pumping stations and water treatment stations in water supply systems installed in the working and regulatory documentation parameters.
  • 3.8. Tests of installed equipment of pumping stations and water treatment stations in water supply systems (including its run-in and under load).
  • 3.9. Preparation of tools and control and measuring instruments for hydropneumatic testing stations and water treatment stations in water supply systems.
  • 3.10. Installation of control and measuring instruments and devices needed for mounting pumping stations and water treatment stations in water supply systems, in control points.
  • 3.11. Eliminating the defects and malfunctions of pumping stations and water treatment stations in water supply systems.
  • 4. Rights

    The installer of the 5th discharge technological pipelines has the right:

    4.1. Request and receive the necessary information, as well as materials and documents related to the activities of the installer of the 5th discharge technological pipelines.

    4.2. Adjust the qualifications, undergo retraining (retraining).

    4.3. To make a relationship with the divisions of third-party institutions and organizations to address issues within the competence of the installer of the 5th discharge technological pipelines.

    4.4. Take part in the discussion of issues included in its functional duties.

    4.5. Make proposals and comments on improving activities on the entrusted area of \u200b\u200bwork.

    4.6. Contact the relevant authorities local governments or to court to resolve disputes arising in the performance of functional duties.

    4.7. Use informational materials and regulatory documents necessary to execute their official duties.

    4.8. Certification in the prescribed manner.

    5. Responsibility

    The installer of the 5th discharge technological pipelines is responsible for:

    5.1. Failure (improper performance) of its functional duties.

    5.2. Failure to comply with orders and instructions of the managing director of the department of development of the qualifications of the institution.

    5.3. Invalid information about the status of assigned tasks and orders, violation of the timing of their execution.

    5.4. Violation of the rules of the internal labor regulation, the rules of fire safety and safety regulations established in the institution.

    5.5. Causing material damage within the limits established by the current legislation of the Russian Federation.

    5.6. Declections of information that became known in connection with the performance of official duties.

    For the above violations, the installer of the 5th discharge technological pipelines can be attracted in accordance with the current legislation, depending on the severity of the offense to disciplinary, material, administrative, civil and criminal liability.

    This job description was developed in accordance with the provisions (requirements) of the Labor Code of the Russian Federation of December 30, 2001 No. 197 of the Federal Law (TK RF) (with amendments and additions), professional standard "Installer of equipment of pumping stations and water treatment stations in water supply systems" approved Order of the Ministry of Labor and Social Protection of the Russian Federation of March 1, 2017 No. 225n and other regulatory and legal acts regulating labor relations.

    Characteristic of work. Perform complex work when installing technological pipelines.

    Installer of technological pipelines 5 category Must know: Rules of laying pipelines with a diameter of more than 200 to 600 mm on a conditional pressure of more than 4 to 9.8 MPa (40 to 100 kgf / cm2), types of supports and fasteners for them. Types of compensators and rules for their installation. Rules for the production of hydraulic and pneumatic testing of pipelines. Terms of use of rigging facilities in the work of work. Rules for mounting complex equipment from glass and pipelines made of glass pipes with a diameter of 75 mm and more. Mounting Rules and Requirements for Pipelines for Solid Pressure up to 9.8 MPa (100 kgf / cm2).
    Work examples. Marking of pads of pipelines. Installing fittings, tees and sectional taps. Docking pipes with a diameter of more than 200 to 1200 mm with flanges. Installation of pipelines with a diameter of up to 200 mm on a conditional pressure of more than 4 to 9.8 MPa (40 to 100 kgf / cm2). Installation of pipelines with a diameter of more than 200 to 400 mm per conditional pressure of up to 4 MPa (40 kgf / cm2). Installation of P-shaped, gland and lens compensators with a diameter of up to 400 mm. Installing reinforcement with a diameter of more than 200 to 400 mm per conditional pressure of up to 4 MPa (40 kgf / cm2). Installing reinforcement with a diameter of up to 200 mm on a conditional pressure of more than 4 to 9.8 MPa (40 to 100 kgf / cm2). Installing the references for measuring thermal expansion and creep metal. Assembly of gummed, plastic pipelines. Installation of glass pipelines with a diameter of 75 mm and more, as well as shaped parts and fittings on the lines of glass pipelines. Hydraulic test A mounted pipeline from glass pipes on a conditional pressure from 0.12 to 3 MPa (1.2 - 3 kgf / cm2). Use of rigging facilities in the work of work. Installation of hydraulic and electrical fittings drives.

    Section Construction, Mounting and Repair and Construction Works ((ETKS №3))

    § 250. Installer of technological pipelines (5th category)

    5th category

    Characteristic of work. Marking of pads of pipelines. Installing fittings, tees and sectional taps. Docking pipes with a diameter of over 200 to 1200 mm with flanges. Installation of pipelines with a diameter of up to 200 mm per conditional pressure over 4 to 9.8 MPa (40 to 100 kgf / cm2) with fittings. Installation of pipelines with a diameter of more than 200 to 400 mm on a conditional pressure of up to 4 MPa (40 kgf / cm2) with fittings. Installation of P-shaped, gland and lens compensators with a diameter of up to 400 mm. Installing the references for measuring thermal expansion and creep metal. Assembly of gummed, plastic pipelines. Installation and testing of pipelines made of glass pipes with a diameter of over 40 mm. Implementation of installation work with rigging tools. Installation of hydraulic and electrical fittings drives.

    Must know: the rules of laying pipelines with a diameter of up to 200 mm on a conditional pressure over 4 to 9.8 MPa (40 to 100 kgf / cm2), types of supports and fasteners for them; Types of compensators and rules for their installation; Rules for the production of hydraulic and pneumatic testing of pipelines; Terms of use of rigging facilities when performing installation work; Rules for mounting pipelines from glass pipes with a diameter of over 40 mm; Montage Rules I. technical requirementspresented to pipelines for conditional pressure up to 9.8 MPa (100 kgf / cm2).

    (next) -\u003e

    I approve the head "_________________" ______________ (_______________) "____" ____________ _____ G. M.P.

    JOB DESCRIPTION

    assembly of technological pipelines of the 5th category

    (for organizations performing construction, assembly

    and repair and construction work)

    1. GENERAL PROVISIONS

    1.1. This job instruction determines functional responsibilities, the rights and responsibility of the installer of technological pipelines of the 5th category "__________________" (hereinafter - "Organization").

    1.2. The assemblyman of the 5th discharge technological pipelines is appointed and exempt from the position in the procedure established by the current labor law by order of the organization's head.

    1.3. The installer of the 5th discharge technological pipelines is subordinate directly ____________________.

    1.4. The person who has ________ is assigned to the post of assembly of technological pipelines of the 5th category. professional education and work experience in the specialty ____ years (without the presentation of work experience).

    1.5. The installer of the 5th discharge technological pipelines should know:

    Rules for laying pipelines with a diameter of up to 200 mm on a conditional pressure of over 4 to 9.8 MPa (40 to 100 kgf / cm2), types of supports and fasteners for them;

    Types of compensators and rules for their installation;

    Rules for the production of hydraulic and pneumatic testing of pipelines;

    Terms of use of rigging facilities when performing installation work;

    Rules for mounting pipelines from glass pipes with a diameter of over 40 mm;

    Mounting Rules and Requirements for Pipelines for Solid Pressure up to 9.8 MPa (100 kgf / cm2).

    1.6. In its activities, the assemblyman of the 5th discharge technological pipelines is guided:

    Regulatory acts on work performed;

    The rules of the internal labor regulation;

    Orders and orders of the head of the organization, direct supervisor;

    A real job description;

    Rules for labor protection, industrial sanitation and fire protection.

    1.7. During the time of the temporary absence of an installer of technological pipelines of the 5th category, his duties are assigned to __________________.

    2. Functional duties

    The installer of the 5th discharge technological pipelines performs the following work:

    Marking of pads of pipelines.

    Installing fittings, tees and sectional taps.

    Docking pipes with a diameter of 200 to 1200 mm with flanges.

    Installation of pipelines with a diameter of up to 200 mm per conditional pressure over 4 to 9.8 MPa (40 to 100 kgf / cm2) with fittings.

    Installation of pipelines with a diameter of more than 200 to 400 mm on a conditional pressure of up to 4 MPa (40 kgf / cm2) with fittings.

    Installation of P-shaped, gland and lens compensators with a diameter of up to 400 mm.

    Installing the references for measuring thermal expansion and creep metal.

    Assembly of gummed, plastic pipelines.

    Installation and testing of pipelines made of glass pipes with a diameter of over 40 mm.

    Implementation of installation work with rigging tools.

    Installation of hydraulic and electrical fittings drives.

    3. Rights

    The installer of the 5th discharge technological pipelines has the right:

    3.1. Require from the management of the organization to assist in the performance of their duties.

    3.2. Get acquainted with the draft decisions of the management of the Organization regarding its activities.

    3.3. Submit proposals to the head of the organization and direct leader on its activities.

    3.4. Receive the service information necessary to fulfill their duties.

    4. Responsibility

    The installer of technology pipelines of the 5th category is responsible:

    4.1. For non-fulfillment or improper performance of their duties stipulated by this official instruction, in accordance with the current labor legislation.

    4.2. For offenses committed during the period of their activities, in accordance with current civil, administrative and criminal legislation.

    4.3. For causing material damage - in accordance with applicable law.

    5. Working conditions

    5.1. The mode of operation of the installer of the 5th discharge technological pipelines is determined in accordance with the rules of the internal labor regulation established in the organization.

    5.2. Due to the production necessity, the installer of the 5th category technological pipelines is obliged to leave for service trips (including local values).

    _____________________________ _____________ _______________________ (position of person who has developed (signature) (Full name) Instruction)

    "___" __________ ____

    AGREED:

    Head of Legal Department (legal adviser) ____________ __________________________ (signature) (Full name)

    "___" __________ ____

    The instruction is familiar with: _____________ _____________________________ (signature) (Full name)

    \Typical job description of the installer of technology pipelines of the 5th category

    Job description Assembly of technological pipelines of the 5th category

    Position: Installer of technology pipelines of the 5th category
    Subdivision: _________________________

    1. General Provisions:

      Subordination:
    • The installer of the 5th discharge technological pipelines is directly subordinate ........................
    • The installer of technological pipelines of the 5th category performs instructions ............................................. ...........

    • (Indications of these workers you are executed only if they do not contradict the directions of the direct supervisor).

      Replacement:

    • The installer of technology pipelines of the 5th category replaces .......................................... .........................................
    • The installer of technology pipelines of the 5th discharge replaces ............................................ .....................................
    • Reception and exemption from office:
      The installer of technological pipelines is appointed and dismissed by the head of the department as a coordination with the head of the unit.

    2. Qualifications Requirements:
      Must know:
    • rules of laying pipelines with a diameter of more than 200 to 600 mm on a conditional pressure of more than 4 to 9.8 MPa (40 to 100 kgf / cm2), types of supports and fasteners for them. Types of compensators and rules for their installation. Rules for the production of hydraulic and pneumatic testing of pipelines. Terms of use of rigging facilities in the work of work. Rules for mounting complex equipment from glass and pipelines made of glass pipes with a diameter of 75 mm and more. Mounting Rules and Requirements for Pipelines for Solid Pressure up to 9.8 MPa (100 kgf / cm2).
    3. Official duties:
    • Perform complex work when installing technological pipelines.
    Page 1 Official instructions Installer of technological pipelines
    Page 2 Official instructions Installer of technological pipelines

    4. Rights

    • The installer of technological pipelines has the right to give to him employees of the assignment, tasks in a circle of issues included in its functional responsibilities.
    • The installer of technological pipelines has the right to control the performance of production tasks, timely execution of individual instructions subordinate to him by employees.
    • Installer of technological pipelines has the right to request and receive necessary materials and documents relating to the issues of their activities and the activities of the staff subordinates.
    • The installer of technological pipelines has the right to cooperate with other enterprise services for manufacturing and other issues included in its functional responsibilities.
    • The installer of technological pipelines has the right to get acquainted with draft decisions of the management of the enterprise concerning the activities of the division.
    • The installer of technological pipelines has the right to offer for consideration by the head of proposal to improve work related to the obligations provided for by this official instruction.
    • The installer of technological pipelines has the right to make a proposal for consideration of the head on the promotion of distinguished workers, imposing peninsions on violators of production and labor discipline.
    • The installer of technological pipelines has the right to report to the head of all identified violations and disadvantages due to the work performed.
    5. Responsibility
    • The installer of technological pipelines is responsible for improper performance or non-fulfillment of its official duties provided for by this official instruction - within the limits defined by the labor legislation of the Russian Federation.
    • The installer of technological pipelines is responsible for violating the rules and regulations governing the activities of the enterprise.
    • When moving to another job or exemption from the post, the installer of technological pipelines is responsible for the proper and timely delivery of the person entering the present position, and in the absence of such, its person replacing it or directly to his leader.
    • The installer of technological pipelines is responsible for the offenses committed in the process of carrying out its activities - within the limits defined by the applicable administrative, criminal and civil law of the Russian Federation.
    • The installer of technological pipelines is responsible for causing material damage - within the limits defined by the current labor and civil law of the Russian Federation.
    • The installer of technological pipelines is responsible for complying with the existing instructions, orders and orders for the preservation of commercial secrets and confidential information.
    • The installer of technological pipelines is responsible for the implementation of the rules of the internal regulation, TB rules and fire safety.
    This job description is developed in accordance with (name, number and document date)

    Structural leader