House, design, renovation, decor.  Courtyard and garden.  With your own hands

House, design, renovation, decor. Courtyard and garden. With your own hands

» Job description of the installer of technological pipelines of the 5th category. Job description of a locksmith

Job description of the installer of technological pipelines of the 5th category. Job description of a locksmith

Unified tariff and qualification reference book of jobs and professions of workers (ETKS), 2019
Issue No. 3 ETKS
The issue was approved by the Order of the Ministry of Health and Social Development of the Russian Federation of 06.04.2007 N 243
(as amended by: Orders of the Ministry of Health and Social Development of the Russian Federation of November 28, 2008 N 679, of April 30, 2009 N 233)

Installer technological pipelines

§ 247. Assembler of technological pipelines of the 2nd category

Description of works... Cleaning fittings, bolts and studs from preservative grease. Flushing of glass equipment, glass pipes and fittings for them. Preservation of pipe ends. Installation and removal of safety plugs and plugs on pipes. Sorting of pipes, fittings and fasteners.

Must know: types of pipes and parts of technological pipelines and fittings; types of glass pipes, fittings for them and glass equipment; types of supports used for laying pipelines; means for fastening pipelines; purpose and rules for the use of locksmith tools; methods of measuring the diameter of pipes.

§ 248. Assembler of technological pipelines of the 3rd category

Description of works... Etching pipes. Etching of glass equipment, glass pipes and fittings for them. Drilling or punching holes. Installation of pipelines from glass pipes with a diameter of up to 25 mm. Degreasing of parts and pipes of the oxygen pipeline.

Must know: assortment of pipes and pipeline parts and fittings; assortment of glass pipes, fittings for them and glass equipment; methods of chemical cleaning of internal surfaces of parts and pipelines; methods of chemical cleaning of equipment made of glass, glass pipes and fittings for them; methods of degreasing parts and pipes of the oxygen pipeline; types of pipeline parts, cushioning material and packings; armature device; device and rules for the use of the used rigging; rules for installing pipelines from glass pipes with a diameter of up to 25 mm; methods of slinging pipes; rules for handling and transporting gas cylinders; types of supports used for laying pipelines.

§ 249. Assembler of technological pipelines of the 4th category

Description of works... Installation of pipelines with a diameter of up to 200 mm for a nominal pressure of up to 4 MPa (40 kgf / cm2) with the installation of fittings. Hydraulic and pneumatic testing of installed pipelines. Installation of hydraulic and electric valve drives. Flanging, dismantling and joining for welding of pipes made of polyethylene, vinyl plastic, aluminum, copper and brass. Installation and testing of pipelines made of glass pipes with a diameter of over 25 to 40 mm. Installation of fittings from glass and valves. Cutting glass pipes on a machine. Cleaning of welded seams for anti-corrosion coatings. Welding of polyethylene and vinyl plastic pipes. On-site fabrication of pipeline elements made of glass, polyethylene, spirally reinforced from polyvinyl chloride, vinyl plastic, aluminum, copper and brass.

Must know: properties of metals; rules for laying and conducting hydraulic and pneumatic testing of pipelines with a diameter of up to 200 mm for a nominal pressure of up to 4 MPa (40 kgf / cm2); rules for the installation of pipelines from glass pipes with a diameter of over 25 to 40 mm; rules for testing pipelines made of glass pipes; rules for slinging pipe assemblies and blocks; ways of giving signals when installing pipelines with cranes; tolerances when preparing joints for welding works; permissible gaps and types of edges when preparing pipes for welding; methods of installation of non-metallic pipelines.

§ 250. Assembler of technological pipelines of the 5th category

Description of works... Marking of places for laying pipelines. Installation of fittings, tees and sectional bends. Docking of pipes with a diameter over 200 to 1200 mm with flanges. Installation of pipelines with a diameter of up to 200 mm for a nominal pressure of more than 4 to 9.8 MPa (40 to 100 kgf / cm2) with the installation of fittings. Installation of pipelines with a diameter of over 200 to 400 mm for a nominal pressure of up to 4 MPa (40 kgf / cm2) with the installation of fittings. Installation of U-shaped, stuffing box and lens compensators up to 400 mm in diameter. Installation of benchmarks for measuring thermal expansion and creep of metal. Assembly of rubberized, plastic pipelines. Installation and testing of pipelines made of glass pipes with a diameter of over 40 mm. Performance installation works with the use of rigging means. Installation of hydraulic and electric valve drives.

Must know: rules for laying pipelines with a diameter of up to 200 mm for a nominal pressure of more than 4 to 9.8 MPa (40 to 100 kgf / cm2), types of supports and fasteners for them; types of compensators and rules for their installation; rules for the production of hydraulic and pneumatic testing of pipelines; rules for using rigging equipment when performing installation work; rules for the installation of pipelines from glass pipes with a diameter of over 40 mm; installation rules and technical requirements applied to pipelines for nominal pressure up to 9.8 MPa (100 kgf / cm2).

§ 251. Assembler of technological pipelines of the 6th category

Description of works... Installation of U-shaped, stuffing box and lens compensators with a diameter of over 400 mm. Taking measurements of the places of laying technological pipelines at the installation site, drawing up sketches for the procurement and laying of pipelines. Installation of remote valve drives. Installation of pipelines with a diameter of over 200 to 600 mm for a nominal pressure of over 4 to 9.8 MPa (40 to 100 kgf / cm2) with the installation of equipment. Installation of pipelines with a diameter of over 600 mm, regardless of pressure, with the installation of fittings. Installation of pipelines for nominal pressure over 9.8 MPa (100 kgf / cm2), regardless of the diameter, with the installation of fittings. Installation of fittings with a diameter over 600 mm regardless of pressure or for a nominal pressure over 9.8 MPa (100 kgf / cm2) regardless of the diameter. Installation of glass vacuum, evaporator, circulation apparatus, etc.

Must know: types flange connections on special gaskets (lens, metal, etc.) and special couplings (ball on a cone); rules for laying pipelines for nominal pressure over 9.8 MPa (100 kgf / cm2); methods for making measurements of pipelines laying places and rules for making sketches of parts; methods of installing pipelines in blocks; rules for the installation of pipelines made of alloy steels; installation rules and technical requirements for pipelines for nominal pressure over 9.8 MPa (100 kgf / cm2); installation rules for installed glass devices.

§ 252. Assembler of technological pipelines of the 7th category

Description of works... Performing complex work with the presentation of strict standards for assessing the quality of work during the installation of pipelines for active circuits of nuclear power plants, main steam pipelines. Installation of pipelines made of corrosion-resistant steels of austenitic class. Installation of clad steel pipelines. Assembly butt joints with different wall thicknesses. Installation of pipelines in large blocks. Performing cold tightness. Piping control panels and equipment according to drawings and models. Installation of steam pipelines at a steam temperature of 450 ° C and above. Performing steam blowing.

Must know: rules for the installation of process pipelines at nuclear power plants, main steam pipelines, clad steel pipelines; methods of installation of pipelines in large-sized blocks; rules for laying out the route of laying the axes of pipelines according to drawings and layouts; methods of performing steam blowing.

Secondary vocational education is required.

Job description installer of technological pipelines of the 2nd (3, 4, 5, 6, 7) category

Compiled in ___ copies. I approve
_______________________________
(initials, surname)


_______________
_________________________________ _______________________________
(name of the employer, (manager or other person,
its organizational and legal authorized to approve
form, address, phone number, address job description)
e-mail, OGRN, INN / KPP)

"___" _____________ ___ year N _____ "___" _________________ ___ year

OFFICIAL INSTRUCTIONS for the installer of technological pipelines of the 2nd (3, 4, 5, 6, 7) category (for organizations performing construction, installation and repair and construction work) __________________________________________ (name of the employer's department)
Developer: _________________
Agreed: _________________
______________________________

The identifier of the electronic copy of the document.

This job description has been developed and approved in accordance with the provisions of the Labor Code of the Russian Federation and other regulations governing labor relations in the Russian Federation.

1. GENERAL PROVISIONS
1.1. The installer of technological pipelines (hereinafter referred to as the Employee) refers to the workers.
1.2. This job description defines functional responsibilities, the rights and responsibilities of the Employee when performing work in the specialty and directly at the workplace in "__________" (hereinafter referred to as the Employer).
1.3. The employee is appointed to the position and dismissed by the order of the Employer in accordance with the procedure established by the current labor legislation.
1.4. The employee reports directly to ______________.
1.5. The employee must know:
2nd category.
Types of pipes and parts of technological pipelines and fittings; types of glass pipes, fittings for them and glass equipment; types of supports used for laying pipelines; means for fastening pipelines; purpose and rules for the use of locksmith tools; methods of measuring the diameter of pipes.
3rd category.
Assortment of pipes and pipeline parts and fittings; assortment of glass pipes, fittings for them and glass equipment; methods of chemical cleaning of internal surfaces of parts and pipelines; methods of chemical cleaning of equipment made of glass, glass pipes and fittings for them; methods of degreasing parts and pipes of the oxygen pipeline; types of pipeline parts, cushioning material and packings; armature device; device and rules for the use of the used rigging; rules for the installation of pipelines from glass pipes with a diameter of up to 25 mm; methods of slinging pipes; rules for handling gas cylinders and their transportation; types of supports used for laying pipelines.
4th category.
Properties of metals; rules for laying and conducting hydraulic and pneumatic testing of pipelines with a diameter of up to 200 mm for a nominal pressure of up to 4 MPa (40 kgf / cm2); rules for the installation of pipelines from glass pipes with a diameter of over 25 to 40 mm; rules for testing pipelines made of glass pipes; rules for slinging pipe assemblies and blocks; ways of giving signals when installing pipelines with cranes; tolerances in the preparation of joints for welding; permissible gaps and types of edges when preparing pipes for welding; methods of installation of non-metallic pipelines.
5th grade.
Rules for laying pipelines with a diameter of up to 200 mm for a nominal pressure of more than 4 to 9.8 MPa (40 to 100 kgf / cm2), types of supports and fasteners for them; types of expansion joints and rules for their installation; rules for the production of hydraulic and pneumatic testing of pipelines; rules for using rigging equipment when performing installation work; rules for the installation of pipelines from glass pipes with a diameter of over 40 mm; installation rules and technical requirements for pipelines for nominal pressure up to 9.8 MPa (100 kgf / cm2).
6th grade.
Types of flange connections on special gaskets (lens, metal, etc.) and special couplings (ball on a cone); rules for laying pipelines for nominal pressure over 9.8 MPa (100 kgf / cm2); methods for making measurements of pipelines laying places and rules for making sketches of parts; methods of installing pipelines in blocks; rules for the installation of pipelines made of alloy steels; installation rules and technical requirements for pipelines for nominal pressure over 9.8 MPa (100 kgf / cm2); installation rules for installed glass devices.

7th category.
Rules for the installation of process pipelines at nuclear power plants, main steam pipelines, clad steel pipelines; methods of installation of pipelines in large-sized blocks; rules for laying out the route of laying the axes of pipelines according to drawings and layouts; methods of performing steam blowing.
Secondary vocational education is required.
1.6. During the temporary absence of the Employee, his duties are assigned to ____________ (position).

2. FUNCTIONAL RESPONSIBILITIES OF THE EMPLOYEE
2nd category.
Cleaning fittings, bolts and studs from preservative grease. Flushing of glass equipment, glass pipes and fittings for them. Preservation of pipe ends. Installation and removal of safety plugs and plugs on pipes. Sorting of pipes, fittings and fasteners.
3rd category.
Etching pipes. Etching of glass equipment, glass pipes and fittings for them. Drilling or punching holes. Installation of pipelines from glass pipes with a diameter of up to 25 mm. Degreasing of parts and pipes of the oxygen pipeline.
4th category.
Installation of pipelines with a diameter of up to 200 mm for a nominal pressure of up to 4 MPa (40 kgf / cm2) with the installation of fittings. Hydraulic and pneumatic testing of installed pipelines. Installation of hydraulic and electric valve drives. Flanging, dismantling and joining for welding of pipes made of polyethylene, vinyl plastic, aluminum, copper and brass. Installation and testing of pipelines made of glass pipes with a diameter of over 25 to 40 mm. Installation of fittings from glass and valves. Cutting glass pipes on a machine. Cleaning of welded seams for anti-corrosion coatings. Welding of polyethylene and vinyl plastic pipes. On-site fabrication of pipeline elements made of glass, polyethylene, spirally reinforced from polyvinyl chloride, vinyl plastic, aluminum, copper and brass.
5th grade.
Marking of places for laying pipelines. Installation of fittings, tees and sectional bends. Docking of pipes with a diameter over 200 to 1200 mm with flanges. Installation of pipelines with a diameter of up to 200 mm for a nominal pressure of over 4 to 9.8 MPa (40 to 100 kgf / cm2) with the installation of fittings. Installation of pipelines with a diameter of over 200 to 400 mm for a nominal pressure of up to 4 MPa (40 kgf / cm2) with the installation of fittings. Installation of U-shaped, stuffing box and lens compensators up to 400 mm in diameter. Installation of benchmarks for measuring thermal expansion and creep of metal. Assembly of rubberized, plastic pipelines. Installation and testing of pipelines made of glass pipes with a diameter of over 40 mm. Installation work using rigging equipment. Installation of hydraulic and electric valve drives.
6th grade.
Installation of U-shaped, stuffing box and lens compensators with a diameter of over 400 mm. Taking measurements of the places of laying technological pipelines at the installation site, drawing up sketches for the procurement and laying of pipelines. Installation of remote valve drives. Installation of pipelines with a diameter of over 200 to 600 mm for a nominal pressure of over 4 to 9.8 MPa (40 to 100 kgf / cm2) with the installation of equipment. Installation of pipelines with a diameter of over 600 mm, regardless of pressure, with the installation of fittings. Installation of pipelines for nominal pressure over 9.8 MPa (100 kgf / cm2), regardless of the diameter, with the installation of fittings. Installation of fittings with a diameter over 600 mm regardless of pressure or for a nominal pressure over 9.8 MPa (100 kgf / cm2) regardless of the diameter. Installation of glass vacuum, evaporator, circulation apparatus, etc.
7th category.
Performing complex work with the presentation of strict standards for assessing the quality of work during the installation of pipelines for active circuits of nuclear power plants, main steam pipelines. Installation of pipelines made of corrosion-resistant steels of austenitic class. Installation of clad steel pipelines. Assembly of butt joints with different wall thicknesses. Installation of pipelines in large blocks. Performing cold tightness. Piping control panels and equipment according to drawings and models. Installation of steam pipelines at a steam temperature of 450 degrees. C and higher. Performing steam blowing.

3. RIGHTS OF THE EMPLOYEE
The employee has the right to:
- Providing him with work stipulated by the employment contract;
- workplace that meets the state regulatory requirements for labor protection and the conditions stipulated by the collective agreement;
- complete reliable information about working conditions and labor protection requirements at the workplace;
- vocational training, retraining and advanced training in the manner prescribed by the Labor Code of the Russian Federation, other federal laws;
- obtaining materials and documents related to their activities;
- interaction with other divisions of the Employer to resolve operational issues of their professional activities.

4. LIABILITY
The employee is responsible for:
4.1. Failure to fulfill their functional duties.
4.2. Inaccurate information about the status of work.
4.3. Failure to comply with orders, orders and instructions of the Employer.
4.4. Violation of safety regulations and labor protection instructions.
Failure to take measures to suppress identified violations of safety regulations, fire safety and other rules that pose a threat to the activities of the Employer and his employees.
4.5. Failure to comply with labor discipline.

5. CONDITIONS OF WORK
5.1. The Work schedule of the Employee is determined in accordance with the Internal Labor Regulations established by the Employer.
5.2. Due to production needs, the Employee is obliged to go on business trips (including local ones).
5.3. In accordance with ____________________, the employer evaluates the performance of the Employee. The set of measures to assess the effectiveness was approved by _________ and includes:
- _____________________;
- _____________________;
- _____________________.

The job description was developed on the basis of _______________________
__________________________________________________________________________.
(name, number and date of the document)

Head of structural
subdivisions
____________________________ _____________________
(initials, surname) (signature)

"__"_____________ ___ G.

Agreed:
legal service
____________________________ _____________________
(initials, surname) (signature)

"__"_____________ ___ G.

I have read the instructions:
(or: I received the instruction)
____________________________ _____________________
(initials, surname) (signature)


Require the creation of conditions for the performance of professional duties, including the provision of necessary equipment, inventory, workplace, corresponding to sanitary and hygienic rules and regulations, etc. 3.6. Require the management of the organization to assist in the performance of their professional duties and the exercise of rights. 3.7. To get acquainted with the draft decisions of the organization's management concerning its activities. 3.8. Improve your professional qualifications. 3.9. [Other rights provided for by the labor legislation of the Russian Federation]. 4. Responsibility The installer of technological pipelines of the 5th category is responsible for: 4.1. For non-performance, improper performance of the duties provided for this instruction, - within the limits determined by the labor legislation of the Russian Federation. 4.2.

Layout of pipelines. Installation of fittings, tees and sectional bends. Joining of pipes with a diameter of over 200 to 1200 mm with flanges. Installation of pipelines with a diameter of up to 200 mm for nominal pressure over 4 to 9.8 MPa (40 to 100 kgf / cm2) fittings. Installation of pipelines with a diameter of over 200 to 400 mm for a nominal pressure of up to 4 MPa (40 kgf / cm2) with the installation of fittings. Installation of U-shaped, stuffing box and lens expansion joints with a diameter of up to 400 mm. Installation of benchmarks for measuring thermal expansion and creep of metal. Assembly of rubber-lined, plastic pipelines. Installation and testing of pipelines from glass pipes with a diameter of over 40 mm. Installation work using rigging equipment. Installation of hydraulic and electric valve drives. Rights.

Job description of the installer of technological pipelines of the 5th category

In his activity, the installer of technological pipelines of the 5th category is guided by: - ​​regulations on the work performed; - internal labor regulations; - orders and orders of the head of the Organization, immediate leader; - this job description; - rules on labor protection, industrial sanitation and fire protection... 1.7. During the temporary absence of the installer of technological pipelines of the 5th category, his duties are assigned to.
2.

FUNCTIONAL RESPONSIBILITIES The installer of process pipelines of the 5th grade carries out the following works: Marking of pipelines. Installation of fittings, tees and sectional bends. Coupling of pipes with a diameter of 200 to 1200 mm with flanges.

404 error page does not exist

Sections: Production of meat products, Bone-processing and glue production, Processing of poultry and rabbits, Butter, cheese and dairy production (approved by the Resolution of the Ministry of Labor of the Russian Federation of March 5, 2004 N 33) 51) Sections: Production of alcoholic and non-alcoholic products, Bakery and pasta production, Confectionery production, Starch production, Sugar production, Production of food concentrates, Tobacco and tobacco and fermentation production, Essential oil production, Tea production, Perfume and cosmetic production, Oil and fat production, Extraction and production of table salt, Extraction and processing of licorice root, Elevator, flour-grinding and feed production, Trade and public catering, Production of canned food (approved by

When compiling a generalized reference book, the following documents were used: 1. Qualification reference book of positions of managers, specialists and other employees (approved by the resolution of the Ministry of Labor of the Russian Federation of August 21, 1998 N 37) (as amended on January 21, August 4, 2000, April 20 2001, May 31, June 20, 2002, July 28, November 12, 2003, July 25, 2005, November 7, 2006, September 17, 2007, April 29, 2008) 2.Uniform tariff - qualification reference book of jobs and professions of workers (Issue 1).

Attention

Workers' professions common to all industries National economy(approved by the decree of the State Committee for Labor of the USSR and the Secretariat of the All-Union Central Council of Trade Unions of January 31, 1985 N 31 / 3-30) (as amended on October 12, 1987, December 18, 1989, May 15, June 22, December 18, 1990, December 24, 1992, February 11, July 19, 1993, June 29, 1995, June 1, 1998, May 17, 2001).

Technological pipeline installer

Important

Carrying out work on acceptance and delivery of the shift, cleaning the workplace, devices, tools, as well as keeping them in proper condition, cleaning equipment, maintaining the established technical documentation. 2.31. [Other job duties]. 3. Rights The installer of technological pipelines of the 5th category has the right: 3.1.

For all social guarantees provided for by the legislation of the Russian Federation. 3.2. For additional vacation. 3.3. For the free distribution of special clothing, special footwear and other personal protective equipment.

3.4. Payment of additional costs for medical, social and vocational rehabilitation in cases of damage to health due to an industrial accident and an occupational disease. 3.5.
Federation.

  • The installer of technological pipelines is responsible for causing material damage - within the limits determined by the current labor and civil legislation of the Russian Federation.
  • The installer of technological pipelines is responsible for compliance with the applicable instructions, orders and orders for the preservation of commercial secrets and confidential information.
  • The installer of technological pipelines is responsible for compliance with internal regulations, safety and fire safety rules.

This job description was developed in accordance with (name, number and date of the document) Head of the structural unit: 00.00.00 (signature) surname, initials AGREED: Head of the legal department: 00.00.00 (signature) surname, initials Familiarized with instructions: 00.00 .00g.

Duties of the installer of technological pipelines of the 5th grade

Installation of pipelines with a diameter of up to 200 mm for a nominal pressure of up to 4 MPa (40 kgf / cm2) with the installation of fittings. Hydraulic and pneumatic testing of installed pipelines.

Installation of hydraulic and electric valve drives. Flanging, dismantling and joining for welding of pipes made of polyethylene, vinyl plastic, aluminum, copper and brass.

Installation and testing of pipelines made of glass pipes with a diameter of over 25 to 40 mm. Installation of fittings from glass and valves.

Cutting glass pipes on a machine. Cleaning of welded seams for anti-corrosion coatings. Welding of polyethylene and vinyl plastic pipes. On-site fabrication of pipeline elements made of glass, polyethylene, spirally reinforced from polyvinyl chloride, vinyl plastic, aluminum, copper and brass.
N 105 / 9-73) (as amended on December 29, 1990) 11.Unified tariff and qualification reference book of works and professions of workers (Issue 65) Sections: General professions of the production of art products, Jewelry and filigree production, Production of art products from metal , Production of art products from wood, burl-root and birch bark, Lapidary production, Production of art products from stone, Production of art products from papier-mache with miniature painting, Production of art products from bone and horn, Production of art products from amber, Sculpture production, Production of primed canvas and cardboard, Production of art products from leather and fur, Production of products of folk art crafts (approved by the decree of the State Committee for Labor of the USSR and the All-Union Central Council of Trade Unions of the USSR on July 2, 1985 No.
Installation of pipelines from glass pipes with a diameter of up to 25 mm. 2.10. Degreasing of parts and pipes of the oxygen pipeline. 2.11. Installation of pipelines with a diameter of up to 200 mm for a nominal pressure of up to 9.8 MPa (up to 100 *) with the installation of fittings. 2.12. Hydraulic and pneumatic testing of installed pipelines. 2.13. Installation of hydraulic and electric valve drives. 2.14. Flanging, dismantling and joining for welding of pipes made of polyethylene, vinyl plastic, aluminum, copper and brass. 2.15. Installation and testing of pipelines made of glass labor regardless of diameter. 2.16. Installation of fittings from glass and valves.


2.17. Cutting glass pipes on a machine. 2.18. Cleaning of welded seams for anti-corrosion coatings. 2.19. Welding of polyethylene and vinyl plastic pipes. 2.20.

JOB DESCRIPTION

installer of technological pipelines of the 5th category

1. General Provisions

1.1. This job description defines the functional, job descriptions, rights and responsibilities of an installer of technological pipelines of the 5th category of the "Pumping Technologies" subdivision (hereinafter - Installer of technological pipelines of the 5th category).

1.2. A person who meets the following requirements for education and training is appointed to the position of an installer of technological pipelines of the 5th category:

  • Vocational training - programs of vocational training in the professions of workers, positions of employees, retraining programs for workers, employees;
  • with practical experience:

  • At least one year in the field of equipment installation pumping stations and water treatment plants in water supply systems at a lower (previous) category;
  • Special conditions for admission to work of an installer of technological pipelines of the 5th category:

  • Passage of instruction on labor protection in accordance with the procedure established by the legislation of the Russian Federation;
  • 1.3. The installer of technological pipelines of the 5th category should know:

  • Rules for slinging and moving goods;
  • Types of pumping stations and water treatment plants in water supply systems, main units, technological equipment and their functional purpose;
  • Building regulations;
  • Methods for connecting equipment of pumping stations and water treatment plants in water supply systems to technological pipelines;
  • Installation rules and technical operation installed equipment of pumping stations and water treatment plants in water supply systems;
  • Labor protection requirements;
  • Requirements of regulatory legal acts, regulatory and technical and regulatory and methodological documents for the installation of equipment for pumping stations and water treatment plants in water supply systems;
  • rules safe operation equipment for pumping stations and water treatment plants in water supply systems;
  • Various types of equipment for pumping stations and water treatment plants in water supply systems;
  • The assortment of materials and equipment used during installation work at pumping stations and water treatment stations in water supply systems;
  • Requirements for the quality of work on the installation of equipment for pumping stations and water treatment plants in water supply systems;
  • Technologies for installation of equipment for pumping stations and water treatment plants in water supply systems;
  • Requirements for the rational organization of work in the workplace;
  • Rules for testing the installed equipment of pumping stations and water treatment plants in water supply systems;
  • Labor protection requirements;
  • Operating instructions for instrumentation required for testing pumping stations and water treatment plants in water supply systems;
  • Purpose and arrangement of instrumentation required for testing pumping stations and water treatment plants in water supply systems;
  • Building regulations;
  • Regulatory documentation for water supply;
  • Methods of quality control of the work performed for the installation of equipment for pumping stations and water treatment plants in water supply systems;
  • 1.4. An installer of technological pipelines of the 5th category should be able to:

  • Use manual and mechanized tools necessary for the installation of pumping stations and water treatment plants in water supply systems;
  • Apply the rules determined by the instructions for the installation of equipment for pumping stations and water treatment plants in water supply systems;
  • Apply modern technologies performing installation work on equipment for pumping stations and water treatment plants in water supply systems;
  • Read the working documentation and the project for the production of work, reflecting the installation of pumping stations and water treatment plants in water supply systems;
  • Observe the requirements of labor protection, fire and environmental safety when performing work on the installation of pumping stations and water treatment plants in water supply systems;
  • Use the equipment necessary for testing during the installation of pumping stations and water treatment plants in water supply systems;
  • Carry out work on the installation of pumping stations and water treatment stations in water supply systems in accordance with technological processes and technological documentation;
  • Use control and measuring devices and tools necessary for the installation of pumping stations and water treatment plants in water supply systems;
  • Conduct tests of pumping stations and water treatment plants in water supply systems in accordance with the methods;
  • 1.5. The installer of technological pipelines of the 5th category is appointed and dismissed by the order of the Managing Director of the Qualifications Development Department of the Institution in accordance with the current legislation of the Russian Federation.

    1.6. The installer of technological pipelines of the 5th category is subordinate to the Managing Director of the Development and Qualifications Department of the Institution and the head of the "Pumping Technologies" subdivision

    2. Labor functions

  • 2.1. Installation of equipment for pumping stations and water treatment plants in water supply systems.
  • 2.2. Testing the installed equipment of pumping stations and water treatment plants for water supply systems.
  • 3. Job responsibilities

  • 3.1. Installation and installation of equipment for pumping stations and water treatment plants in water supply systems.
  • 3.2. Checking the readiness of the site for the installation of equipment for pumping stations and water treatment plants in water supply systems.
  • 3.3. The study working documentation and instructions for the installation of equipment for pumping stations and water treatment plants in water supply systems.
  • 3.4. Execution of installation work on the joining of equipment of pumping stations and water treatment plants in water supply systems with technological pipelines.
  • 3.5. Marking of installation sites for equipment of pumping stations and water treatment plants in water supply systems.
  • 3.6. Drawing up the necessary executive documentation when installing pumping stations and water treatment plants in water supply systems in accordance with the requirements of the legislation of the Russian Federation.
  • 3.7. Comparison of the test results of pumping stations and water treatment plants in water supply systems with those installed in the working and regulatory documents parameters.
  • 3.8. Testing of the installed equipment of pumping stations and water treatment plants in water supply systems (including its running-in idle and under load).
  • 3.9. Preparation of tools and instrumentation for carrying out hydropneumatic tests of pumping stations and water treatment plants in water supply systems.
  • 3.10. Installation of control and measuring instruments and devices necessary for the installation of pumping stations and water treatment plants in water supply systems, at control points.
  • 3.11. Elimination of defects and malfunctions of pumping stations and water treatment plants found in the process of monitoring in water supply systems.
  • 4. Rights

    The installer of technological pipelines of the 5th category has the right:

    4.1. Request and receive the necessary information, as well as materials and documents related to the activities of an installer of technological pipelines of the 5th category.

    4.2. Improve qualifications, undergo retraining (retraining).

    4.3. Enter into relationships with subdivisions of third-party institutions and organizations to resolve issues within the competence of an installer of technological pipelines of the 5th category.

    4.4. Participate in the discussion of issues included in his functional responsibilities.

    4.5. Make suggestions and comments on improving performance in the assigned area of ​​work.

    4.6. Contact the appropriate authorities local government or to the court to resolve disputes arising from the performance of functional duties.

    4.7. Use information materials and regulatory documents necessary for the performance of their duties.

    4.8. Pass certification in accordance with the established procedure.

    5. Responsibility

    The installer of technological pipelines of the 5th category is responsible for:

    5.1. Failure to perform (improper performance) of their functional duties.

    5.2. Failure to comply with the orders and instructions of the Managing Director of the Qualifications Development Department of the Institution.

    5.3. Inaccurate information about the status of the execution of assigned tasks and orders, violation of the deadlines for their execution.

    5.4. Violation of the internal labor regulations, fire safety and safety rules established at the Institution.

    5.5. Causing material damage within the limits established by the current legislation of the Russian Federation.

    5.6. Disclosure of information that has become known in connection with the performance of official duties.

    For the above violations, an installer of technological pipelines of the 5th category can be brought to disciplinary, material, administrative, civil and criminal liability in accordance with the current legislation, depending on the severity of the offense.

    This job description was developed in accordance with the provisions (requirements) of the Labor Code of the Russian Federation of December 30, 2001 No. 197 FZ (Labor Code of the Russian Federation) (with amendments and additions), the professional standard "Installer of equipment for pumping stations and water treatment plants in water supply systems" approved by order of the Ministry of Labor and Social Protection of the Russian Federation of March 1, 2017 No. 225n and other regulatory legal acts governing labor relations.

    Section Construction, installation and repair and construction works((ETKS # 3))

    § 250. INSTALLER OF TECHNOLOGICAL PIPELINES (5th grade)

    5th grade

    Description of the work. Marking of places for laying pipelines. Installation of fittings, tees and sectional bends. Docking of pipes with a diameter over 200 to 1200 mm with flanges. Installation of pipelines with a diameter of up to 200 mm for a nominal pressure of over 4 to 9.8 MPa (40 to 100 kgf / cm2) with the installation of fittings. Installation of pipelines with a diameter of over 200 to 400 mm for a nominal pressure of up to 4 MPa (40 kgf / cm2) with the installation of fittings. Installation of U-shaped, stuffing box and lens compensators up to 400 mm in diameter. Installation of benchmarks for measuring thermal expansion and creep of metal. Assembly of rubberized, plastic pipelines. Installation and testing of pipelines made of glass pipes with a diameter of over 40 mm. Installation work using rigging equipment. Installation of hydraulic and electric valve drives.

    Should know: rules for laying pipelines with a diameter of up to 200 mm for a nominal pressure of more than 4 to 9.8 MPa (40 to 100 kgf / cm2), types of supports and fasteners for them; types of expansion joints and rules for their installation; rules for the production of hydraulic and pneumatic testing of pipelines; rules for using rigging equipment when performing installation work; rules for the installation of pipelines from glass pipes with a diameter of over 40 mm; installation rules and technical requirements for pipelines for nominal pressure up to 9.8 MPa (100 kgf / cm2).

    (next) ->